Reference

Projects
  • A partial list of the most signature projects along with a partial ongoing and completed projects list in the Power & Water sector has been included in this section. As the leading EPC company in the region, we are proud to display our impressive client list.
  • Hail 2 Power Plant Expansion

    Project No. : PM 105 Project Name : Hail 2 Power Plant Expansion- Extension III Starting Date : 6-Apr-2011 Target Date : 30-Nov-2012 Client Name : SEC-COA

    Project call for the lump sum Turnkey for the EPC work by adding[4] New Indoor Simple Cycle Gas Turbine(GTG) Units each of 66.8 MW, with their associated auxiliaries and Balance of Plant [BOP] which shall be constructed as an extension of the existing Hail-2 Power Plant Expansion Project.

    The contract responsibilities include design, supply and install commission trial operation of all the systems, equipment and connections necessary for a fully integrated Hail-2 Power plant. The Bop includes Fuel Storage tanks, Fuel system, WTP, Compressed Air system, Diesel generator, Electrical Switchgears, Transformers, I&C, DCS System and Civil works.

    40 Mw Power Plant In Qurayat

    Project No. : PM-20 Project Name : Power Generation work for Construction of 40 Mw Power Plant In Qurayat Starting Date : 1989 Target Date : 1992 Client Name : Electricity Corporation

    Project Brief Description:

    This project mainly involved the dismantling transportation and re-installation of 2X20 MW BBC type 9 gas turbines complete with auxiliary systems.The gas turbines were taken out from SCECO Central's Alkharj P/P.

    Dismantling of the following:

  • Powerhouse building steel structures, wall, roof, overhead crane etc.
  • 2X20 MW GT generator unit with all accessories including static starting device, excitation and voltage regulation equipment, T/G protection, control & measurement apparatuses, synchronizing equip. etc
  • Two chimneys and 2X30 MVA, 13.8/33 kV, 3 Phase auxiliary alternator step-up transformers.
  • Complete development of work site in Qurayat having an area of 500X500 meters including perimeter security fence and internal and access roads is done by alfanar along with the following major works

  • Foundations for all plant equipments and tanks and Construction of cable and pipe trenches.
  • § Construction of building such as office & workshop, transport workshop, fire fighting pump house, fue pump house and water treatment plant , gate house and security stands.
  • Distillate oil storage facility with tanks capacity of 3 x 3500 Cu.m. including remote control system. Distillate purification plant with approximate capacity of 20 Cu.m. per hour. Water treatment plant and incinerator facility. Fire fighting system including fire alarm and detection covering the entire plant. Interconnecting pipes for all mechanical equipment and self cleaning filters. Extensive maintenance / overhauling were performed on the generator cooling water system, 1.5 MW diesel generator unit, fuel circulation electric operated valves, H.P. fuel pumps, lube oil auxiliary pumps, heat exchangers and air blow out valves.
  • Modification of turbine control to meet the new site conditions.
  • 380 V main distribution board. LV cables supplying all buildings, pumps, incinerator, GT auxiliaries, perimeter lighting, road
  • Sharourah Power Plant Extension

    Project No. : PE-88 Project Name : Sharourah Power Plant Extension Starting Date : 15-Mar-08 Target Date : 19-Aug-10 Client Name : SEC-South

    Project Brief Description:

    The extension of Sharourah Power Plant consists of :

    Adding Three (3) Gas Turbine Generator Units by 51.0 MW and their related auxiliaries, Civil Work, Fuel unloading system, Fuel Storage tanks, Fuel Treatment Plant and Forwarding system, Water treatment plant with DM Production, Compressed air system, Fuel Piping and pumping, Cathodic Protection system, DCS control system, MIS, PMS, TIMS, Power Transformer, substation switchgears, auxiliary transformers, cabling, control & protection, Complete Civil Works including foundations buildings and Roads.

    Engineering, design, procure, supply and deliver all equipments and materials to the work site, construct, install, test and commission the extension of Sharourah Power Plant by :

    Portion – 1

    Adding two (2) Gas Turbine Generator Units by 33.996 MW, their associated auxiliaries and Balance of Plant (BOP) as GTG unit # 1 and GTG Unit # 2.

    Portion – 2

    Adding one (1) Gas Turbine Generator Unit of 16.998 MW, its associated auxiliaries and Balance of Plant (B.O.P) as GTG Unit # 3 for project portion 2.

    New Hiteen 380/132KV BSP at PP5

    Project No. : PE-93 Project Name : Construction of New Hiteen 380/132KV BSP (# 9005) At PP5 Starting Date : 13-June-09 Target Date : 13-Nov-2011 Client Name : SEC-COA

    Project Brief Description:

    380 / 132 KV Hiteen BSP Sub Station (#9005) located near Power Plant # 5 (PP-5) comprises of four (4) portions as following:-

  • Portion-1 (New 380/132 KV BSP SS #9005)
  • Portion-2 (Protection Replacement in SS#9000 & Wasia 230 KV SS)
  • Portion-3 (Protection Replacement in SS#9019 & Khurais 380KV SS)
  • Portion-4 (Central Region Telecom Control Centre-CRTCC)
  • Portion–I of the project comprised of the 380 KV GIS (6Dia-18 CB’s), 132 KV GIS (42 CB’s), 502 MVA Power Transformers (6 Nos), 40MVAR Reactor (2Nos) and its Protection & Control, SCADA, SOE, Fault Recorder & Telecommunication systems.

    This portion includes the temporary re-routing of the 380 KV Double circuit over Head Line (OHL) approximately for a route length of 1.0 KM.

    This portion also includes the Protection modification in SS # 9002, 9004,9008,9001,8079 and SCADA extension in SS# 9011 & 9025

    Portion–II of the project comprised of Overhead line Protection Panels Replacement in SS#9000 & Wasia 230 KV SS and Extension of its associatedSCAD & SOE systems

    Portion–III of the project comprised of Overhead line Protection Panels Replacement in SS#9019 & Khurais 380 KV SS and Extension of its associatedSCAD, SOE & Fault Recorder (TFR) systems

    Portion–IV of the project comprised of construction of Central Region Telecom Control Centre (CRTCC) with all facilities such as emergency power supply systems, Public Addressing systems, Network systems and telecom systems.

    Jeddah RO Plant – Phase III

    Project Name : Jeddah RO Plant – Phase III Starting Date : Jul-2009 Target Date : Mar-2012 Client Name : SWCC

    Brief Description:

    This project includes the complete Civil Works for the desalination Plant at Jeddah. The scope of work is as follows:

    1- ON SHORE CIVIL WORKS:

    Site preparation , Dewatering, Piling, Sheet Piling, R.C.C equipment, Water Channels, Culverts, foundations , pipe works, Road & paving…..etc

    2- CIVIL WORKS FOR INTAKE REHABILITATION:

    Intake Rehabilitation work consists of civil works like Demolition, Shoring, Dewatering, Earth Work, Concrete Work, Coating & Painting Work, Joint Work, Steel & GRP Work, Paving Work

    3- CIVIL WORKS FOR BUILDINGS :

    Building works (27,764 M2) consist of Earth work, Concrete & Formwork, Pre-engineering building, Steel work, Masonry & Plastering work, Floor finish work, Wall finish work, Ceiling work, Roofing work, Waterproofing & Damp proofing work and Windows, Doors & Elevator work

    New Haramain High Speed Railway 380kv Substations

    Project No. : PE-107 Project Name : Construction of New Haramain High Speed Railway 380kv -Substations (Six Substations) Starting Date : 07-Mar-2011 Target Date : 06-Aug-2013 Client Name : SEC-COA

    Project Scope:

    Construction of New Haramain High Speed Railway 380 KV Sub Station's ( Six Sub Stations) in Makkah, Jeddah, Rabigh & Madinah.

    Complete Design& Engineering, procurement, Installation, Testing & commissioning of the following Equipments:-

    • 380 KV GIS ( 96 Bays)
    • 110 KV GIS ( 60 Bays)
    • 380/110/13.8kV 500 MVA TF (6 Nos)
    • 380/33kV 40 MVA TF (9 Nos)
    • 110/33kV 40MVA TF (4 Nos)
    • 110/33kV 67MVA TF (6 Nos)
    • 33kV Switchgear (89 CB)
    • 13.8kV Switchgear (88CB)
    • All associated protection & Sub Station Automation Systems
    • Communication Systems
    • Civil works

    Const of new Al Qadisiyah 115/13.8kV S/Stn

    • Client : SEC-EOA
    • Awarded Date : Nov-06
    • Target Date : Jan-12

    Addtnl Power Supply to KFU at Hassa

    • Client : KFU
    • Awarded Date : May-08
    • Target Date : Mar-12

    Power Supply at Kharj Military Base S/Stn 8701

    • Client : MODA
    • Awarded Date : Nov-09
    • Target Date : May-12

    New Hiteen 380/132kV BSP ( 9005 ) at PP-5

    • Client : SEC-COA
    • Awarded Date : Jun-09
    • Target Date : Apr-121

    New 380/132kV BSP at Jazan Economic City

    • Client : JEC
    • Awarded Date : Jul-09
    • Target Date : Jan-12

    Princess Noura Cable Interconnection

    • Client : SEC-COA
    • Awarded Date : Oct-09
    • Target Date : May-12

    KFU Cable

    • Client : KFU
    • Awarded Date : Aug-10
    • Target Date : Mar-12

    KAFD Electrical Power Substation -8191,8192,8193,8194

    • Client : RIC
    • Awarded Date : Mar-10
    • Target Date : Feb-12

    Construction of Aljouf 380kv BSP & Extn. of Hail 380kV S/S

    • Client : SEC-EOA
    • Awarded Date : Sep-10
    • Target Date : Sep-12

    Hail-2 Power Plant Expansion Extn.III

    • Client : SEC-COA
    • Awarded Date : Apr-11
    • Target Date : Nov-12

    Construction of New Hara Main High Speed Railway 380kV Substations

    • Client : SEC-WOA
    • Awarded Date : Mar-11
    • Target Date : Aug-13

    Expansion of Abu Hadriya 380kV Substation

    • Client : SEC-EOA
    • Awarded Date : Jun-11
    • Target Date : Aug-13

    Expansion of 380kV Taif BSP

    • Client : SEC-WOA
    • Awarded Date : Jun-11
    • Target Date : Sep-13

    Construction of New 132kV S/S -8189 and Instalation of 132 kV Cable Circuits- Mauten

    • Client : MASHEED
    • Awarded Date : Nov-11
    • Target Date : Jun-13

    Construction of Qurayyah 380 / 230 kV Sub Station

    • Client : SAMSUNG C&T
    • Awarded Date : Oct-11
    • Target Date : Sep-13

    Construction of Substation in the University Campus in Zulfi

    • Client : MOHE
    • Awarded Date : Nov-11
    • Target Date : Oct-13
    Name of Project Client Awarded Date Completion Date

    Hail - 2 Power Plant expansion-Ext. II

    SEC-COA

    Jun-10

    Sep-11

    Construction of New 132/13.8kV S/S 8167,Extn to S/S 9015 & installation of 132kV Cable circuits (8167-9015) & (8167-8118)

    NATIONAL GUARD

    Aug-09

    Dec-11

    380/110kV Makkah West S/S

    SEC-WOA

    Dec-08

    Jan-11

    Construction of new Kandarah 380/110/13.8kV BSP in Jeddah city

    SEC-WOA

    Jun-08

    Dec-10

    Sharourah Power Plant Extension Portion 1 (GTG 1&2) & Portion 2 (GTG 3)

    SEC-SOA

    Apr-08

    Mar-10

    Construction of 380 K.V S/S -Works Associated with Integration of Phase-1 of Rabigh (2) Power Plant

    SEC-COA

    Nov-07

    Oct-09

    Construction of New 380/110Kv Thuwal BSP

    SEC-WOA

    Jul-07

    Jun-09

    Transformer Reinforcement At 132/33 Kv Ss # 8812 In Al-Zulfi At Al-Qassim Area

    SEC-COA

    Jun-07

    Jan-07

    Reinforcement of 132 kV OHTL Between Al-Wajh S/S & Al-Ula S/S

    SEC-WOA

    Dec-06

    Dec-08

    380 kV Substation Works Associated with Generation Expansion Project of PP-8 in Riyadh City (S/S 9021)

    SEC-EOA

    Dec-06

    Dec-08

    Power Supply to Saudi Aramco East West- Pump Station 3 (SS & OHL)

    SEC-EOA

    Nov-06

    Oct-08

    Construction of 132/13.8 kV SS. No. 8139 At King Abdullah Area in Riyadh City

    SEC-COA

    Nov-06

    Jul-09

    Construction of 132/33kV SS. No. 8065 At. Al Thumamah Area in Riyadh City

    SEC-COA

    Nov-06

    Sep-09

    Reinforcement Of 132/33 Kv Ss No. 8705 At Al Kharj Area

    SEC-COA

    Nov-06

    Sep-09

    115kV OHL for new Saihat S/S

    SEC-EOA

    Nov-06

    Jan-09

    Const.of new Saihat 115/13.8kV S/S

    SEC-EOA

    Nov-06

    Apr-11

    Extension of 110KV GIS at Madinah South 380/110KV SS

    SEC-WR

    Jun-06

    Mar-08

    Reinforcement Of Wadi Jalil 380-110-13.8kv – Makkah

    SEC-WOA

    Mar-06

    Aug-08

    Construction of New Al-Misfalah-2 110/13.8 kV S/S

    SEC-WOR

    Mar-06

    Dec-08

    Extension Of Al Shafa 110-13.8kv Substation+A1

    SEC-WOR

    Mar-06

    Dec-08

    Enhancement work for Telecommunication Systems Supporting Energy Transmission Network in sec-coa

    SEC-COA

    Mar-06

    Sep-08

    Construction Of The New Al-Sharaieh 110/13.8 Kv S/S

    SEC-WOA

    Feb-06

    Jun-08

    Extension Of Al Sheesha 110-13.8kv Substation

    SEC-WOA

    Feb-06

    Sep-08

    Extension Of Jabal Al Noor 110-13.8kv Substation Makkah

    SEC-WOA

    Feb-06

    May-08

    Construction of 115/13.8 kV Al-Masoudi S/S

    SEC-EOA

    Feb-06

    Nov-08

    Power Supply To Haradh Crude Increment II

    SEC-EOA

    Feb-06

    Jul-08

    69/13.8kV S/Stn # 2 Distribution Feeders to KFU Substation tn# 4

    KFU

    Nov-05

    Nov-06

    Juaymah Area Reinforcement (Phase II)

    SEC-EOA

    Mar-06

    May-09

    Reinforcement of 380/110 kV Jamia S/S 3rd Transformer 380/110 kV: 500MVA

    SEC-WOA

    May-05

    May-07

    Construction Of 132 Kv Cable Circuit 8060/9019, 8058/8006 To Connect Ss # 9013 To The Network

    SEC-COA

    Mar-05

    May-07

    Reinforcement Of 1st. Dammam Industrial City 69/13.8 Kv Ss # 2

    SEC-EOA

    Mar-05

    May-08

    Extension Of Jeddah North Substation

    SEC-WRB

    Feb-05

    Dec-06

    Protection Modification of 380/132KV System at Hail Area

    SEC-COA

    Feb-05

    Mar-06

    New 33/13.8KV Skaka Industrial SS In Skaka Area

    SEC-EOA

    Jan-05

    Mar-08

    Replacement of Defective 250MVA Transformer at 380kV KMT S/S

    SEC-WOA

    Apr-04

    Mar-05

    115kV Overhead Lines Subcontract At Abu Ali Plant

    Al-Osais Co. (ARAMCO)

    Apr-04

    Dec-04

    115KV Overhead Lines Subcontract at Juaymah Gas Plant (For Aramco)

    Al Osais Co

    Apr-04

    Dec-04

    Aramco-subcontract-115kV OHL Uthmaniya GOSP 9,11 & 12 control system

    Al-Osais Co. (ARAMCO)

    Feb-04

    Aug-05

    Construction Of New 380kv S/S 9013 (Shifa)

    SEC-CRB

    Oct-03

    Aug-06

    Construction of Jeddah North 380/110/13.8 kV S/S (Switchgear, Power Transformer & Civil Works)

    SEC-WRB

    May-03

    May-05

    Capacity Reinforcement of (7) Substations (Al-Baha S/S)

    SEC-SRB

    Apr-03

    Aug-05

    Construction of 132/13.8 kV S/S # 8089 at Al-Mugharazat Area, Riyadh.

    SEC-CRB

    Nov-02

    Feb-05

    Shifting of S/W Container at Kudai 110 kV S/S and Construction of a Retaining Wall.

    SEC-WRB

    Nov-02

    May-05

    Construction of 110/13.8KV S/S at SAFA lot-2,SCADA & Communication System

    SEC-WRB

    Aug-02

    Jan-04

    Upgrade of Tele-communication & Protection Signal Equipment for the 132 kV Transmission Networks at Al-Qassim.

    SEC-CRB

    Apr-02

    Apr-04

    Permanent Replacement of Damaged Transformer T-603 at Shedgum Power Plant.

    SEC-ERB

    Apr-02

    Apr-04

    Reinforcement of 132 kV S/S # 8070, 8802 & 8803

    SEC-CRB

    Jan-02

    Oct-03

    Power Transformer & Shunt Reactors for KAAU III S/S.

    KAAU - King Abdul Aziz University

    Jan-01

    Feb-04

    Permanent Power Supply to Sang 115/13.8 kV SS Al Hassa

    National Guard

    Sep-00

    Nov-02

    Upgrade of Overcurrent Relays

    SEC-WRB

    Jul-00

    Jan-02

    Transformer Reinforcement at 132/33 kV S/S # 8065, 8801 & 8076

    SEC-CRB

    Jan-00

    Jun-01

    Construction of Mushrefa 110/13.8 kV S/S (Lot-1, Switchgear)

    SCECO-West

    Dec-99

    Jun-02

    Reinforcement of Dhahran Central 230/69 kV S/S.

    SCECO-East

    Nov-99

    May-04

    Construction of Mina-2 110/13.8 kV S/S in Makkah (Lot-2: Civil Works)

    SCECO-West

    Jul-99

    Jan-01

    Construction of Al-Naqa'a 110/13.8 kV S/S in Madinah (Switchgear)

    SCECO-West

    Jul-99

    Mar-02

    Hail-Qassim Interconnection & Communication System.

    SEC-CRB

    May-99

    May-01

    Hail Network Control Centre & Associated Systems (Scada System)

    SEC-CRB

    Jun-98

    Nov-00

    Al-Jouf Network Control Upgrade Project (Scada System)

    SEC-CRB

    May-97

    Aug-00

    Wadi Jaleel 380/110kv Outdoor Substation Project In Makkah

    SEC-WRB

    Apr-97

    Oct-99

    Wadi Jaleel 110 Kv Power & West Pilot Cables Project In Makkah

    SCECO-West

    Apr-97

    Oct-99

    Al-Rawdah 115/13.8 kV S/S and Annunciator Panels in (4) four H. O. A. at South Hofuf S/S.

    SCECO EAST

    May-96

    Oct-98

    Al-Khafji 115/13.8 kV S/S No. 3 and Associated Modifications.

    SCECO-East

    Apr-96

    Apr-99

    Relocation Of Pumping Station- O.H.L Gantry

    SCECO-West

    Jun-95

    Jan-96

    132 kV , 13.8 kV S/S Project at Askan Al-Aam

    Real Estate Dev. Fund

    Oct-94

    Jun-96

    Operation & maintenance of New Qurayat Power Plant.

    Electricity Corporation

    1992

    1993

    Construction Of 40 Mw Power Plant In Qurayat

    Electricity Corporation

    1990

    1992

    Gas Turbine Project Extension of Air Defense Power House at Jeddah.

    MODA

    1988

    1989

    Tabuk Regional Electrification Project, 132 kV S/S Duba, Bida & Haql.

    Electricity Corporation

    1987

    1988

    132 Kv Xlpe Cables For The Substation At Haram & Misfalah

    SCECO-West

    1992

    1994

    Early Warning For Fuel Leakage At K.K.I.A. - Jeddah

    SAMAREC

    1992

    1993

    Battery 117 Permanent Power Supply, Tabuk.

    MODA

    1992

    1993

    110 kV Overhead Transmission Lines, Arafat, Makkah

    SCECO-West

    1991

    1992

    Relocation of 110 kV Power & Pilot Cables on 2nd. Ring Road, Madenah.

    SCECO-West

    1991

    1992

    110 kV Overhead Transmission Lines, Yanbau Al-Baher.

    SCECO-West

    1990

    1992

    Hail Water Works Power Supply 13.8 kV Distribution.

    Electricity Corporation

    1988

    1989

    Modification of Sub-transmission and Distribution of 13.8 kV Network A.D.I., Jeddah

    MODA

    1988

    1989

    Al-Aqiq / Al-Baha Water Supply Project.

    M O WE

    1987

    1988

    Hail Electrification Project, Lot-5

    Electricity Corporation

    1986

    1989

    Supervisory Control And Data Acquisition (Scada) For Layla Aflaj

    Electricity Corporation

    1985

    1989

    Sarat Obeidah Distribution Project.

    SCECO-South

    1984

    1985

    Wadi Bin Hashbal Distribution Project.

    SCECO-South

    1984

    1985

    Al-Aqiq (Al-Baha).

    SCECO-South

    1983

    194

    Dammam-Dhahran Highway Lighting.

    Ministry of Transportation

    1981

    1983

    Sajir Electrification Project.

    Electricity Corporation

    1981

    1983

    Four Schools In Wadi Al-dawasir

    Ministry of Education

    1979

    1981

    Fire Brodge Building in Riyadh & Dammam

    National Guard

    1978

    1979

    Farasan Island Electrification Project.

    Electricity Corporation

    1979

    1981