Project call for the lump sum Turnkey for the EPC work by adding[4] New Indoor Simple Cycle Gas Turbine(GTG) Units each of 66.8 MW, with their associated auxiliaries and Balance of Plant [BOP] which shall be constructed as an extension of the existing Hail-2 Power Plant Expansion Project.
The contract responsibilities include design, supply and install commission trial operation of all the systems, equipment and connections necessary for a fully integrated Hail-2 Power plant. The Bop includes Fuel Storage tanks, Fuel system, WTP, Compressed Air system, Diesel generator, Electrical Switchgears, Transformers, I&C, DCS System and Civil works.
This project mainly involved the dismantling transportation and re-installation of 2X20 MW BBC type 9 gas turbines complete with auxiliary systems.The gas turbines were taken out from SCECO Central's Alkharj P/P.
Complete development of work site in Qurayat having an area of 500X500 meters including perimeter security fence and internal and access roads is done by alfanar along with the following major works
Adding Three (3) Gas Turbine Generator Units by 51.0 MW and their related auxiliaries, Civil Work, Fuel unloading system, Fuel Storage tanks, Fuel Treatment Plant and Forwarding system, Water treatment plant with DM Production, Compressed air system, Fuel Piping and pumping, Cathodic Protection system, DCS control system, MIS, PMS, TIMS, Power Transformer, substation switchgears, auxiliary transformers, cabling, control & protection, Complete Civil Works including foundations buildings and Roads.
Engineering, design, procure, supply and deliver all equipments and materials to the work site, construct, install, test and commission the extension of Sharourah Power Plant by :
Adding two (2) Gas Turbine Generator Units by 33.996 MW, their associated auxiliaries and Balance of Plant (BOP) as GTG unit # 1 and GTG Unit # 2.
Adding one (1) Gas Turbine Generator Unit of 16.998 MW, its associated auxiliaries and Balance of Plant (B.O.P) as GTG Unit # 3 for project portion 2.
380 / 132 KV Hiteen BSP Sub Station (#9005) located near Power Plant # 5 (PP-5) comprises of four (4) portions as following:-
Portion–I of the project comprised of the 380 KV GIS (6Dia-18 CB’s), 132 KV GIS (42 CB’s), 502 MVA Power Transformers (6 Nos), 40MVAR Reactor (2Nos) and its Protection & Control, SCADA, SOE, Fault Recorder & Telecommunication systems.
This portion includes the temporary re-routing of the 380 KV Double circuit over Head Line (OHL) approximately for a route length of 1.0 KM.
This portion also includes the Protection modification in SS # 9002, 9004,9008,9001,8079 and SCADA extension in SS# 9011 & 9025
Portion–II of the project comprised of Overhead line Protection Panels Replacement in SS#9000 & Wasia 230 KV SS and Extension of its associatedSCAD & SOE systems
Portion–III of the project comprised of Overhead line Protection Panels Replacement in SS#9019 & Khurais 380 KV SS and Extension of its associatedSCAD, SOE & Fault Recorder (TFR) systems
Portion–IV of the project comprised of construction of Central Region Telecom Control Centre (CRTCC) with all facilities such as emergency power supply systems, Public Addressing systems, Network systems and telecom systems.
This project includes the complete Civil Works for the desalination Plant at Jeddah. The scope of work is as follows:
Site preparation , Dewatering, Piling, Sheet Piling, R.C.C equipment, Water Channels, Culverts, foundations , pipe works, Road & paving…..etc
Intake Rehabilitation work consists of civil works like Demolition, Shoring, Dewatering, Earth Work, Concrete Work, Coating & Painting Work, Joint Work, Steel & GRP Work, Paving Work
Building works (27,764 M2) consist of Earth work, Concrete & Formwork, Pre-engineering building, Steel work, Masonry & Plastering work, Floor finish work, Wall finish work, Ceiling work, Roofing work, Waterproofing & Damp proofing work and Windows, Doors & Elevator work
Construction of New Haramain High Speed Railway 380 KV Sub Station's ( Six Sub Stations) in Makkah, Jeddah, Rabigh & Madinah.
Complete Design& Engineering, procurement, Installation, Testing & commissioning of the following Equipments:-
Const of new Al Qadisiyah 115/13.8kV S/Stn
Addtnl Power Supply to KFU at Hassa
Power Supply at Kharj Military Base S/Stn 8701
New Hiteen 380/132kV BSP ( 9005 ) at PP-5
New 380/132kV BSP at Jazan Economic City
Princess Noura Cable Interconnection
KFU Cable
KAFD Electrical Power Substation -8191,8192,8193,8194
Construction of Aljouf 380kv BSP & Extn. of Hail 380kV S/S
Hail-2 Power Plant Expansion Extn.III
Construction of New Hara Main High Speed Railway 380kV Substations
Expansion of Abu Hadriya 380kV Substation
Expansion of 380kV Taif BSP
Construction of New 132kV S/S -8189 and Instalation of 132 kV Cable Circuits- Mauten
Construction of Qurayyah 380 / 230 kV Sub Station
Construction of Substation in the University Campus in Zulfi
Name of Project | Client | Awarded Date | Completion Date |
Hail - 2 Power Plant expansion-Ext. II |
SEC-COA |
Jun-10 |
Sep-11 |
Construction of New 132/13.8kV S/S 8167,Extn to S/S 9015 & installation of 132kV Cable circuits (8167-9015) & (8167-8118) |
NATIONAL GUARD |
Aug-09 |
Dec-11 |
380/110kV Makkah West S/S |
SEC-WOA |
Dec-08 |
Jan-11 |
Construction of new Kandarah 380/110/13.8kV BSP in Jeddah city |
SEC-WOA |
Jun-08 |
Dec-10 |
Sharourah Power Plant Extension Portion 1 (GTG 1&2) & Portion 2 (GTG 3) |
SEC-SOA |
Apr-08 |
Mar-10 |
Construction of 380 K.V S/S -Works Associated with Integration of Phase-1 of Rabigh (2) Power Plant |
SEC-COA |
Nov-07 |
Oct-09 |
Construction of New 380/110Kv Thuwal BSP |
SEC-WOA |
Jul-07 |
Jun-09 |
Transformer Reinforcement At 132/33 Kv Ss # 8812 In Al-Zulfi At Al-Qassim Area |
SEC-COA |
Jun-07 |
Jan-07 |
Reinforcement of 132 kV OHTL Between Al-Wajh S/S & Al-Ula S/S |
SEC-WOA |
Dec-06 |
Dec-08 |
380 kV Substation Works Associated with Generation Expansion Project of PP-8 in Riyadh City (S/S 9021) |
SEC-EOA |
Dec-06 |
Dec-08 |
Power Supply to Saudi Aramco East West- Pump Station 3 (SS & OHL) |
SEC-EOA |
Nov-06 |
Oct-08 |
Construction of 132/13.8 kV SS. No. 8139 At King Abdullah Area in Riyadh City |
SEC-COA |
Nov-06 |
Jul-09 |
Construction of 132/33kV SS. No. 8065 At. Al Thumamah Area in Riyadh City |
SEC-COA |
Nov-06 |
Sep-09 |
Reinforcement Of 132/33 Kv Ss No. 8705 At Al Kharj Area |
SEC-COA |
Nov-06 |
Sep-09 |
115kV OHL for new Saihat S/S |
SEC-EOA |
Nov-06 |
Jan-09 |
Const.of new Saihat 115/13.8kV S/S |
SEC-EOA |
Nov-06 |
Apr-11 |
Extension of 110KV GIS at Madinah South 380/110KV SS |
SEC-WR |
Jun-06 |
Mar-08 |
Reinforcement Of Wadi Jalil 380-110-13.8kv – Makkah |
SEC-WOA |
Mar-06 |
Aug-08 |
Construction of New Al-Misfalah-2 110/13.8 kV S/S |
SEC-WOR |
Mar-06 |
Dec-08 |
Extension Of Al Shafa 110-13.8kv Substation+A1 |
SEC-WOR |
Mar-06 |
Dec-08 |
Enhancement work for Telecommunication Systems Supporting Energy Transmission Network in sec-coa |
SEC-COA |
Mar-06 |
Sep-08 |
Construction Of The New Al-Sharaieh 110/13.8 Kv S/S |
SEC-WOA |
Feb-06 |
Jun-08 |
Extension Of Al Sheesha 110-13.8kv Substation |
SEC-WOA |
Feb-06 |
Sep-08 |
Extension Of Jabal Al Noor 110-13.8kv Substation Makkah |
SEC-WOA |
Feb-06 |
May-08 |
Construction of 115/13.8 kV Al-Masoudi S/S |
SEC-EOA |
Feb-06 |
Nov-08 |
Power Supply To Haradh Crude Increment II |
SEC-EOA |
Feb-06 |
Jul-08 |
69/13.8kV S/Stn # 2 Distribution Feeders to KFU Substation tn# 4 |
KFU |
Nov-05 |
Nov-06 |
Juaymah Area Reinforcement (Phase II) |
SEC-EOA |
Mar-06 |
May-09 |
Reinforcement of 380/110 kV Jamia S/S 3rd Transformer 380/110 kV: 500MVA |
SEC-WOA |
May-05 |
May-07 |
Construction Of 132 Kv Cable Circuit 8060/9019, 8058/8006 To Connect Ss # 9013 To The Network |
SEC-COA |
Mar-05 |
May-07 |
Reinforcement Of 1st. Dammam Industrial City 69/13.8 Kv Ss # 2 |
SEC-EOA |
Mar-05 |
May-08 |
Extension Of Jeddah North Substation |
SEC-WRB |
Feb-05 |
Dec-06 |
Protection Modification of 380/132KV System at Hail Area |
SEC-COA |
Feb-05 |
Mar-06 |
New 33/13.8KV Skaka Industrial SS In Skaka Area |
SEC-EOA |
Jan-05 |
Mar-08 |
Replacement of Defective 250MVA Transformer at 380kV KMT S/S |
SEC-WOA |
Apr-04 |
Mar-05 |
115kV Overhead Lines Subcontract At Abu Ali Plant |
Al-Osais Co. (ARAMCO) |
Apr-04 |
Dec-04 |
115KV Overhead Lines Subcontract at Juaymah Gas Plant (For Aramco) |
Al Osais Co |
Apr-04 |
Dec-04 |
Aramco-subcontract-115kV OHL Uthmaniya GOSP 9,11 & 12 control system |
Al-Osais Co. (ARAMCO) |
Feb-04 |
Aug-05 |
Construction Of New 380kv S/S 9013 (Shifa) |
SEC-CRB |
Oct-03 |
Aug-06 |
Construction of Jeddah North 380/110/13.8 kV S/S (Switchgear, Power Transformer & Civil Works) |
SEC-WRB |
May-03 |
May-05 |
Capacity Reinforcement of (7) Substations (Al-Baha S/S) |
SEC-SRB |
Apr-03 |
Aug-05 |
Construction of 132/13.8 kV S/S # 8089 at Al-Mugharazat Area, Riyadh. |
SEC-CRB |
Nov-02 |
Feb-05 |
Shifting of S/W Container at Kudai 110 kV S/S and Construction of a Retaining Wall. |
SEC-WRB |
Nov-02 |
May-05 |
Construction of 110/13.8KV S/S at SAFA lot-2,SCADA & Communication System |
SEC-WRB |
Aug-02 |
Jan-04 |
Upgrade of Tele-communication & Protection Signal Equipment for the 132 kV Transmission Networks at Al-Qassim. |
SEC-CRB |
Apr-02 |
Apr-04 |
Permanent Replacement of Damaged Transformer T-603 at Shedgum Power Plant. |
SEC-ERB |
Apr-02 |
Apr-04 |
Reinforcement of 132 kV S/S # 8070, 8802 & 8803 |
SEC-CRB |
Jan-02 |
Oct-03 |
Power Transformer & Shunt Reactors for KAAU III S/S. |
KAAU - King Abdul Aziz University |
Jan-01 |
Feb-04 |
Permanent Power Supply to Sang 115/13.8 kV SS Al Hassa |
National Guard |
Sep-00 |
Nov-02 |
Upgrade of Overcurrent Relays |
SEC-WRB |
Jul-00 |
Jan-02 |
Transformer Reinforcement at 132/33 kV S/S # 8065, 8801 & 8076 |
SEC-CRB |
Jan-00 |
Jun-01 |
Construction of Mushrefa 110/13.8 kV S/S (Lot-1, Switchgear) |
SCECO-West |
Dec-99 |
Jun-02 |
Reinforcement of Dhahran Central 230/69 kV S/S. |
SCECO-East |
Nov-99 |
May-04 |
Construction of Mina-2 110/13.8 kV S/S in Makkah (Lot-2: Civil Works) |
SCECO-West |
Jul-99 |
Jan-01 |
Construction of Al-Naqa'a 110/13.8 kV S/S in Madinah (Switchgear) |
SCECO-West |
Jul-99 |
Mar-02 |
Hail-Qassim Interconnection & Communication System. |
SEC-CRB |
May-99 |
May-01 |
Hail Network Control Centre & Associated Systems (Scada System) |
SEC-CRB |
Jun-98 |
Nov-00 |
Al-Jouf Network Control Upgrade Project (Scada System) |
SEC-CRB |
May-97 |
Aug-00 |
Wadi Jaleel 380/110kv Outdoor Substation Project In Makkah |
SEC-WRB |
Apr-97 |
Oct-99 |
Wadi Jaleel 110 Kv Power & West Pilot Cables Project In Makkah |
SCECO-West |
Apr-97 |
Oct-99 |
Al-Rawdah 115/13.8 kV S/S and Annunciator Panels in (4) four H. O. A. at South Hofuf S/S. |
SCECO EAST |
May-96 |
Oct-98 |
Al-Khafji 115/13.8 kV S/S No. 3 and Associated Modifications.
SCECO-East Apr-96 Apr-99 | |||
Relocation Of Pumping Station- O.H.L Gantry |
SCECO-West |
Jun-95 |
Jan-96 |
132 kV , 13.8 kV S/S Project at Askan Al-Aam |
Real Estate Dev. Fund |
Oct-94 |
Jun-96 |
Operation & maintenance of New Qurayat Power Plant. |
Electricity Corporation |
1992 |
1993 |
Construction Of 40 Mw Power Plant In Qurayat |
Electricity Corporation |
1990 |
1992 |
Gas Turbine Project Extension of Air Defense Power House at Jeddah. |
MODA |
1988 |
1989 |
Tabuk Regional Electrification Project, 132 kV S/S Duba, Bida & Haql. |
Electricity Corporation |
1987 |
1988 |
132 Kv Xlpe Cables For The Substation At Haram & Misfalah |
SCECO-West |
1992 |
1994 |
Early Warning For Fuel Leakage At K.K.I.A. - Jeddah |
SAMAREC |
1992 |
1993 |
Battery 117 Permanent Power Supply, Tabuk. |
MODA |
1992 |
1993 |
110 kV Overhead Transmission Lines, Arafat, Makkah |
SCECO-West |
1991 |
1992 |
Relocation of 110 kV Power & Pilot Cables on 2nd. Ring Road, Madenah. |
SCECO-West |
1991 |
1992 |
110 kV Overhead Transmission Lines, Yanbau Al-Baher. |
SCECO-West |
1990 |
1992 |
Hail Water Works Power Supply 13.8 kV Distribution. |
Electricity Corporation |
1988 |
1989 |
Modification of Sub-transmission and Distribution of 13.8 kV Network A.D.I., Jeddah |
MODA |
1988 |
1989 |
Al-Aqiq / Al-Baha Water Supply Project. |
M O WE |
1987 |
1988 |
Hail Electrification Project, Lot-5 |
Electricity Corporation |
1986 |
1989 |
Supervisory Control And Data Acquisition (Scada) For Layla Aflaj |
Electricity Corporation |
1985 |
1989 |
Sarat Obeidah Distribution Project. |
SCECO-South |
1984 |
1985 |
Wadi Bin Hashbal Distribution Project. |
SCECO-South |
1984 |
1985 |
Al-Aqiq (Al-Baha). |
SCECO-South |
1983 |
194 |
Dammam-Dhahran Highway Lighting. |
Ministry of Transportation |
1981 |
1983 |
Sajir Electrification Project. |
Electricity Corporation |
1981 |
1983 |
Four Schools In Wadi Al-dawasir |
Ministry of Education |
1979 |
1981 |
Fire Brodge Building in Riyadh & Dammam |
National Guard |
1978 |
1979 |
Farasan Island Electrification Project. |
Electricity Corporation |
1979 |
1981 |