Projects
Central Province | Eastern Province | Western Province | Southern Province
Western Province Projects
On-going Projects:
PE-68
| Contract No |
20431074/00 |
Project/Contract Title: |
Construction Of The New Al-Sharaieh 110/13.8 Kv S/S |
Client Name: |
SEC-WOA |
Location |
Al-Sharaieh |
Contract Start Date |
18-Feb-06 |
Completion Date |
15-June-08 |
Progress % |
93.8% |
Category: |
Mechanical, Civil, T&C, Scada, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
40MVA Power Transformer
HV / MV / Control Cables
AVC Panels
SCADA & Telecom
Request for more details pertaining to this project – psmd@alfanar.com |
PE-68
| Contract No |
20531095/00 |
Project/Contract Title: |
Extension of Al Shisha 110/13.8kV SS |
Client Name: |
SEC- WOA |
Location |
Al Shisha |
Contract Start Date |
13-Feb-06 |
Completion Date |
05-Sep-08 |
Progress % |
96.6% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
40 MVA Power Transformer
HV, MV, LV & Control Cables
SCADA System
Request for more details pertaining to this project – psmd@alfanar.com |
PE-68
| Contract No |
20531094/00 |
Project/Contract Title: |
Extension of Jabal Al Noor 110/13.8kV SS |
Client Name: |
SEC-WOA |
Location |
Jabal Al Noor |
Contract Start Date |
18-Feb-06 |
Completion Date |
15-May-08 |
Progress % |
90.68% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
110kV GIS Bays
67MVA Power Transformers
13.8kV Switchgear
HV / MV / LV Cables
Control Cables
Request for more details pertaining to this project – psmd@alfanar.com |
PE-70
| Contract No |
20531076/00 |
Project/Contract Title: |
Reinforcement of Wadi Jaleel 380-110-13.8kV SS In Makkah |
Client Name: |
SEC-WOA |
Location |
Makkah |
Contract Start Date |
22-Mar-06 |
Completion Date |
22-Aug-08 |
Progress % |
98.3% |
Category: |
Mechanical, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
500MVA, Power Transformer, 380/110kV
380kV, Live Tank Circuit Breakers, 3150A, 50kA
110kV Live Tank Circuit Breakers, 2000/3150A, 40KA
380kV Disconnect Switches, 3150A, 50KA
110kV Disconnect Switches, 2000/3150A, 40KA
380kV Free Standing Current Transformers
Request for more details pertaining to this project – psmd@alfanar.com |
PE-71
| Contract No |
20531098/00 |
Project/Contract Title: |
Construction of New Al-Misfalah-2 110/13.8 kV S/S |
Client Name: |
SEC-WOR |
Location |
Al-Misfalah |
Contract Start Date |
11-Mar-06 |
Completion Date |
03-Dec-08 |
Progress % |
95.34% |
Category: |
Mechanical, Civil, T&C, SCADA, |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
110kV GIS Bays
110/13.8kV Power Transformers
13.8kV Switchgear
115kV Surge Arresters (Outdoor)
Control, Protection and Metering for complete substation
SCADA & Telecom System
1 Lot Civil work for building finishes
Request for more details pertaining to this project – psmd@alfanar.com |
PE-73
| Contract No |
20631004/00 |
Project/Contract Title: |
Mechanical works for Extension of 110 kV GIS at Madinah South 380/110 kV S/S |
Client Name: |
SEC-WR |
Location |
…… |
Contract Start Date |
12/06/06 |
Completion Date |
10/11/08 |
Category: |
OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Supply and installation of new package A/C units as 70-SMSS – 01 for executed portion of 380kV GIS & 110kV GIS
Extension of the existing -110 kV GIS hall including basement.
380/110kV fault recording system, Mosaic control panel board with control metering and alarm facilities plus other control equipment.
Galvanized piping in switchgear and control rooms, for FM 200 gas system
Request for more details pertaining to this project – psmd@alfanar.com |
PE-81
| Contract No |
20631040/00 |
Project/Contract Title: |
Reinforcement of 132 kV OHTL Between Al-Wajh S/S & Al-Ula S/S |
Client Name: |
SEC-WOA |
Location |
Al Ula |
Contract Start Date |
23-Dec-06 |
Completion Date |
23-Dec-08 |
Progress % |
63.45% |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :
Design & Engineering for the B/M Equipment
2. 132kv, 6-MVAR Shunt Reactor Along with Line Terminating Equipment
132KV SWITCHGEAR BAY – 2 Nos
Steel structure & support.
Foundation and civil works
Protection and control for Shunt Reactor
FR & SER
RTU FOR AL-ULA S/S
MICROSCADA EQUIPMENT FOR AL-WAJH S/S
AC distribution panel Modifications
LV & Control Cables
Request for more details pertaining to this project – psmd@alfanar.com |
PE-84
| Contract No |
20733005/00 |
Project/Contract Title: |
Construction of New 380/110Kv Al Thuwal BSP |
Client Name: |
SEC-WOA |
Location |
Al Thuwal |
Contract Start Date |
15-Aug-07 |
Completion Date |
15-Jun-09 |
Progress % |
57.56 |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
380/110 k.V. Thuwal BSP:
380 k.V. GIS
110 k.V. GIS
500 MVA Power Transformer.
Control & Protection of 380/110 k.V. System.
Telecommunication System.
SCADA, SOE & TFR System.
Remote Ends ( Rabigh – 1380 k.V. S/S, HVE 280 k.V. S/S)
Protection Modification.
SCADA & Telecommunication System.
Request for more details pertaining to this project – psmd@alfanar.com |
Western Province Projects
Completed Projects:
PE-59
| Contract No |
20431067/00 |
Project/Contract Title: |
Extension of Jeddah North Substation |
Client Name: |
SEC-WRB |
Location |
Jeddah |
Contract Start Date |
28/2/2005 |
Completion Date |
28/12/2006 |
Category: |
Mechanical, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following
500MVA Power Transformer
380kV & 110kV Bus Duct
6 nos 110kV GIS Bays
Transformer foundation, bus duct support foundation
Transformer fire fighting , water spray system extension
Request for complete details pertaining to this project – psmd@alfanar.com |
PE-65
| Contract No |
20331001/00 |
Project/Contract Title: |
Reinforcement of 380/110 kV Jamia
S/S 3rd Transformer 380/110 kV: 500MVA |
Client Name: |
SEC-WOA |
Location |
Jamia |
Contract Start Date |
21/05/05 |
Completion Date |
21/05/07 |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
1 nos. 380/110kV, 500 MVA Power Transformer
1 nos. 300KVA, 33/0.231kV Auxiliary / Grounding Transformer
8 nos. 33kV Switchgear panels
2 nos. Battery & Charger
1 Lot Civil works
1 Lot 132kV XLPE cable and accessories.
1 Lot 33kV XLPE cable and accessories
1 Lot Fire Fighting Systems
1 Nos. AC Distribution Board.
1 Lot Power Transformer and auxiliary transformers foundations, oil separation pit, transformer room modification in ventilation system for transformers.
1 Lot Latest version of Sergi system for fire fighting of the new transformer along with nitrogen and control panels
Extension SCADA System
Request for complete details pertaining to this project – psmd@alfanar.com |
| | |