| Name of Project |
Construction of new Kandarah 380/110/13.8kV BSP in Jeddah city |
Client Name: |
SEC-WRB |
Location |
Jeddah City |
Value |
494,729,040 SR |
Completion Date |
25 Months |
Value: |
494,729,040 SR |
Turnkey Or Sub-Contract |
Turnkey |
Consortium |
NA |
Scope of Work: |
The project is 380kv Substation with 10 Bays having 1500MVA Transformation Capacity to Feed 23 Nos 110kv Feeder at different susbsation .
The substation is inclusive of one reactor of 80 MVAR .
The substation will be connected with Jamia and KMT 380kv Substations with 380kv underground Cables.
This Substation will supply the Power to the Central areas & down Town of Jeddah City and enhance the power Grid capability in those areas. |
| Name of Project |
Sharourah Power Plant Extension |
Client Name: |
SEC-SOA |
Location |
Sharourah City |
Value |
358,733,371 SR |
Completion Date |
23 Months |
Value: |
358,733,371 SR |
Turnkey Or Sub-Contract |
Turnkey |
Consortium |
NA |
Scope of Work: |
Engineering, Design, procure, supply and deliver all equipments and materials to the WORK SITE, construct, install, test and commission the extension of Sharourah Power Plant by:
- Adding two [2] Gas Turbine Generator Units by 33.996MW, their associated auxiliaries and Balance of Plant [B.O.P.] as GTG Unit # 1 and GTG Unit # 2 for Project Portion 1.
- Adding one [1] Gas Turbine Generator Unit of 16.998MW, its associated auxiliaries and Balance of Plant [B.O.P.] as GTG Unit # 3 for Project Portion 2.
The Balance of Plant includes, Fuel tanks, Fuel treatment, Water treatment, Compressed Air system, Fire fighting, HVAC, Cranes, Civil Works, Switchgear building unloading bays, Electrical works includes GSU transformers, 33 & 4.16 kV Switchgear, Cabling, complete I&C including DCS, CEMS and other instrumentation works. |
Any Other Detail |
Technical Partnership - CMEC, China |
| Contract No. & Signing
Date |
534/22/3 |
| Client Name |
SEC-CRB |
| Project/ Contract Title and Brief Description
of Work |
CONSTRUCTION OF NEW 380KV S/S 9013 AT SHIFA AREA,
SOUTH OF RIYADH
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING
OF A NEW 380/132KV S/S# 9013 IN SOUTH OF RIYADH CITY
TWELVE (12) BAYS, 380KV GIS, SEVENTEEN (17) BAYS 132KV
GIS, THREE (3), 380/132/33KV 500MVA, POWER TRANSFORMERS
AND ASSOCIATED CONTROL, PROTECTION, RELAYING METERING,
AUXILIARIES, SCADA, TELECOMMUNICATION, FIBER OPTIC EQUIPMENT,
(INCLUDING REMOTE END MODIFICATION S/S OF 380KV &
132KV INVOLVED), CABLES AND TWO DOUBLE CIRCUITS 380KV
OHL (APPROX. 625 METERS EACH) AND CIVIL & ELECTROMECHANICAL
WORK INCLUDING 380KV GIS BUILDING, 132KG GIS BUILDING,
380/132KV TRANSFORMER ROOMS AND CONTROL BUILDING ETC.,
|
| Contract Start Date |
26-Oct-2003 |
| Contract Completion Date |
26-May-2006 |
| Value (Saudi Riyals) |
204,842,787 |
| Contract No. & Signing
Date |
2/1/23 |
| Client Name |
SEC-WRB |
| Project/ Contract Title and Brief Description
of Work |
CONSTRUCTION OF JEDDAH NORTH 380/110KV SUBSTATION
(SWITCHGEAR, POWER TRANSFORMERS & CIVIL WORKS)
DESIGN, SUPPLY, ERECTION & TESTING OF COMPLETE
NEW SUBSTATION COMPRISING OF : 15 BAYS OF 380KV GAS
INSULTED SWITCHGEAR, 25 BAYS OF 110KV GAS INSULATED
SWITCHGEAR, 2 X 500MVA POWER TRANSOFRMER 7 1 X 60MVAR
380KV SHUNT REACTOR. |
| Contract Start Date |
10-May-2003 |
| Contract Completion Date |
10-Aug-2005 |
| Value (Saudi Riyals) |
172,206,392 |
| Contract No. & Signing
Date |
36/1/16 |
| Client Name |
SEC-WRB |
| Project/ Contract Title and Brief Description
of Work |
Construction of 380/110 kV Wadi Jaleel Outdoor S/S
in Makkah (lot-1, Switchgear & Civil Works)
380/110kV Outdoor Switchgear, Busbar System, Control
and Protection, Auxiliary System, Civil and Mechanical
Works, it is one of the largest construction jobs. Live
Insulator Washing System installed for the first time
in KSA. |
| Contract Start Date |
03-Apr-1997 |
| Contract Completion Date |
01-04-2000 |
| Value (Saudi Riyals) |
124,085,568 |
| Contract No. & Signing
Date |
23/10/-/-/Sheen |
| Client Name |
EC |
| Project/ Contract Title and Brief Description
of Work |
CONSTRUCTION OF 40 MW POWER PLANT IN QURAYAT
TURNKEY PROJECT FOR COMPLETE CONSTRUCTION OF POWER
HOUSE & ASSOCIATE BUILDINGS, DISMANTLING, TRANSPORTATION
AND REINSTALLATION OF 2 X 20 MW GAS TURBINES, 2 X 28.5
MVA POWER TRANSFORMERS, SUPPLY & INSTALLATION OF
WATER, FIRE DETECTION / FIGHTING SYSTEMS, 2 X 1500 KVA,
13.8 / CABLES & TRANSFORMERS. |
| Contract Start Date |
1989 |
| Contract Completion Date |
1992 |
| Value (Saudi Riyals) |
61, 091,753 |
|
|
|