Projects
On-going Projects | Completed Projects | Prestigious Projects | Regionwise Projects
On-going Projects
PE-63
| Contract No |
30441103/00 |
Project/Contract Title: |
Reinforcement Of 1st. Dammam Industrial city 69/13.8 Kv Ss # 2. |
Client Name: |
SEC-EOA |
Location |
Dammam |
Contract Start Date |
05-May-05 |
Completion Date |
05-Sep-08 |
Progress % |
95% |
Category: |
Mechanical, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
Extension of existing 69kV Outdoor Type Substation with one transformer bay which includes the following :-
69/13.8kV Power Transformer 30/40MVA
60kV Outdoor type Surge Arresters
69kV Circuit Breaker, Disconnect Switches
69kV CTs, VTs and wall bushing - 13.8kV Switchgear 2000A
13.8kV LV and Control Cables
SCADA System
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-66
| Contract No |
30431070/00 |
Project/Contract Title: |
Juaymah Area Reinforcement (Phase Ii) |
Client Name: |
SEC-EOA |
Location |
Juaymah |
Contract Start Date |
30-Jul-05 |
Completion Date |
29-May-09 |
Progress % |
87.31% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
115kV, 14 Nos bays - 115kV cables,
protection & control,
protection modification at 230kV Ghazlan & Juaymah NGL S/S,
Transmission Line
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-67
| Contract No |
27 |
Project/Contract Title: |
69/13.8kV S/Stn # 2 Distribution Feeders to KFU Substation tn# 4 |
Client Name: |
KFU |
Location |
……. |
Contract Start Date |
14-Oct-05 |
Completion Date |
……. |
Progress % |
96.23% |
Category: |
Mechanical, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
69kV, 4 Nos. GIS bays
Two transformer 40MVA cable feeders complete with 13.8kV protection and control,
Civil and electromechanical work for the complete substation.
The new S/Stn will remotely controlled by SCADA system from the company power control
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-68
| Contract No |
20431074/00 |
Project/Contract Title: |
Construction Of The New Al-Sharaieh 110/13.8 Kv S/S |
Client Name: |
SEC-WOA |
Location |
Al-Sharaieh |
Contract Start Date |
18-Feb-06 |
Completion Date |
15-June-08 |
Progress % |
93.8% |
Category: |
Mechanical, Civil, T&C, Scada, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
40MVA Power Transformer
HV / MV / Control Cables
AVC Panels
SCADA & Telecom
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-68
| Contract No |
20531095/00 |
Project/Contract Title: |
Extension of Al Shisha 110/13.8kV SS |
Client Name: |
SEC- WOA |
Location |
Al Shisha |
Contract Start Date |
13-Feb-06 |
Completion Date |
05-Sep-08 |
Progress % |
96.6% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
40 MVA Power Transformer
HV, MV, LV & Control Cables
SCADA System
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-68
| Contract No |
20531094/00 |
Project/Contract Title: |
Extension of Jabal Al Noor 110/13.8kV SS |
Client Name: |
SEC-WOA |
Location |
Jabal Al Noor |
Contract Start Date |
18-Feb-06 |
Completion Date |
15-May-08 |
Progress % |
90.68% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
110kV GIS Bays
67MVA Power Transformers
13.8kV Switchgear
HV / MV / LV Cables
Control Cables
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-69
| Contract No |
30131003/00 |
Project/Contract Title: |
Power supply to Haradh Crude Increment II |
Client Name: |
SEC-EOA |
Location |
Haradh |
Contract Start Date |
23-Feb-06 |
Completion Date |
19-Apr-08 |
Progress % |
98% |
Category: |
Mechanical, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning for the left over portion of the work by terminated contractor M/s Gulf Potential and includes the following :-
AC / DC Distribution System
Protection System
SCADA
Grounding, Lighting, Transmission Line
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-69
| Contract No |
30531144/00 |
Project/Contract Title: |
Construction of 115/13.8 kV Al-Masoudi S/S |
Client Name: |
SEC-EOA |
Location |
Al-Masoudi |
Contract Start Date |
23-Feb-06 |
Completion Date |
30-Nov-08 |
Progress % |
66% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
115kV GIS Bays
115/13.8kV Power Transformers
13.8kV Switchgear Line Up
115kV Surge Arresters (Outdoor)
Control, Protection and Metering for complete substation
Medium density Fiber Optic Equipment
SCADA System
Civil work complete including buildings, trenches, etc
Mechanical, complete works
Indoor / Outdoor lighting works
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-70
| Contract No |
20531076/00 |
Project/Contract Title: |
Reinforcement of Wadi Jaleel 380-110-13.8kV SS In Makkah |
Client Name: |
SEC-WOA |
Location |
Makkah |
Contract Start Date |
22-Mar-06 |
Completion Date |
22-Aug-08 |
Progress % |
98.3% |
Category: |
Mechanical, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work:
|
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
500MVA, Power Transformer, 380/110kV
380kV, Live Tank Circuit Breakers, 3150A, 50kA
110kV Live Tank Circuit Breakers, 2000/3150A, 40KA
380kV Disconnect Switches, 3150A, 50KA
110kV Disconnect Switches, 2000/3150A, 40KA
380kV Free Standing Current Transformers
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-71
| Contract No |
20531098/00 |
Project/Contract Title: |
Construction of New Al-Misfalah-2 110/13.8 kV S/S |
Client Name: |
SEC-WOR |
Location |
Al-Misfalah |
Contract Start Date |
11-Mar-06 |
Completion Date |
03-Dec-08 |
Progress % |
95.34% |
Category: |
Mechanical, Civil, T&C, SCADA, |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
110kV GIS Bays
110/13.8kV Power Transformers
13.8kV Switchgear
115kV Surge Arresters (Outdoor)
Control, Protection and Metering for complete substation
SCADA & Telecom System
1 Lot Civil work for building finishes
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-72
| Contract No |
10531109/00 |
Project/Contract Title: |
Enhancement work for Telecommunication Systems Supporting Energy Transmission Network in sec-coa |
Client Name: |
SEC-COA |
Location |
…… |
Contract Start Date |
29-Mar-06 |
Completion Date |
26-Sep-08 |
Progress % |
83.32% |
Category: |
OHTL, Civil, T&C, SCADA, |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
280 KM OPGW Cables (24 fibres equivalent to 14.33mm GW)
101 KM OPGW Cables (24 fibres equivalent to 7.91mm GW)
49 KM OPGW Cables (36 fibres equivalent to 18.1mm GW)
11 KM U/G NFOC Cables (36 fibres)
2.6 KM U/G NFOC Cables (24 fibres)
1 Lot Joint boxes and splitter boxes
1 Lot Civil works
1 Lot Spare parts and training at site
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE 73
| Contract No |
20631004/00 |
Project/Contract Title: |
Mechanical works for Extension of 110 kV GIS at Madinah South 380/110 kV S/S |
Client Name: |
SEC-WR |
Location |
…… |
Contract Start Date |
12/06/06 |
Completion Date |
10/11/08 |
Category: |
OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Supply and installation of new package A/C units as 70-SMSS – 01 for executed portion of 380kV GIS & 110kV GIS
Extension of the existing -110 kV GIS hall including basement.
380/110kV fault recording system, Mosaic control panel board with control metering and alarm facilities plus other control equipment.
Galvanized piping in switchgear and control rooms, for FM 200 gas system
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-74
| Contract No |
30631036/00 |
Project/Contract Title: |
Construction of New Saihat 115/13.8kV Substation |
Client Name: |
SEC-EOA |
Location |
Saihat |
Contract Start Date |
20-Nov-06 |
Completion Date |
11-Jan-09 |
Progress % |
52.13% |
Category: |
Mechanical, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouse's) respectively, construct, install test and commission and put into service new Saihat 115/13.8kV S/S # 2 and the associated modifications to Al Dhahiyan 380/115kV bulk supply point (BSP) S/S as described below in accordance with the Scope of work and technical specifications, PTS-05EN122:
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-75
| Contract No |
30631037/00 |
Project/Contract Title: |
Construction of HIE 115/13.8kV SS#2 & Modification of 13.8 kV Switchgear @RWPS SS |
Client Name: |
SEC-EOA |
Location |
……. |
Contract Start Date |
20-Nov-06 |
Completion Date |
11-Feb-09 |
Progress % |
63.36% |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouses respectively, construct, install test and commission and put into service Hassa Industrial Estate (hereafter referred to as H.I.E) 115/13.8kV S/S-2 and the associated modifications to existing H.I.E 115/13.8kV S/S and Al Uyun 115/13.8kV S/S and new 13.8kV Switchgear and the associated modifications to existing RWPS 3C line valve #6 115/13.8kV S/S as described below in accordance with the Scope of work and Technical Specification, PTS-05EN128 and PTS-05EM129. The work consists of the following project portions.
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-76
| Contract No |
30631038/00 |
Project/Contract Title: |
Construction of New Al Qadisiyyah 115/13.8kV SS |
Client Name: |
SEC-EOA |
Location |
Al Qadisiyyah |
Contract Start Date |
20-Nov-06 |
Completion Date |
11-Dec-08 |
Progress % |
36.5% |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouse's) respectively, construct, install test and commission and put into service new Al Qadisiyyah 115/13.8kV SS and the modification to existing North Mubaraaz 115/13.8kV S/S and Hasa Home Ownership 115/13.8kV S/S as described below in accordance with the scope of work and Technical Specifications, PTS-05EN120: Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-77
| Contract No |
30633046/00 |
Project/Contract Title: |
Power Supply to Saudi Aramco East West- Pump Station 3 (SS & OHL) |
Client Name: |
SEC-EOA |
Location |
…… |
Contract Start Date |
20-Nov-06 |
Completion Date |
11-Oct-08 |
Progress % |
74.67% |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
|
Scope of Work: |
Contractor shall design, engineer, procure supply and deliver all equipment and materials including operational spare parts and special equipment and / or tools to the work site and company designated warehouse(s) respectively, construct, install, test and commission the following:
Project Portion – 1. Design, Supply, Installation & testing of 230kV Wasia substation expansion by 3 no 230 kV circuit breaker with Ct, S, 6 Nos 230 kV disconnector, port insulation AC/DC auxiliary protector & control and communication system along with expansion of SCADA, SDE & Fault recorder
The scope includes protection system enunciator & SOE expansion at Saudi Aramco E/W pumping station #3 for the related lines with Wasia Project Portion – 2. Design, Procurement & construction of 230kV(16.65 kilometers) double
Circuit lattice Steel overhead transmission line with 2 OPGW from Wasia 230kV substation to East west pump station # 3 S/S
Civil works. 230kV Substation portion.
Site development of existing Substation by now asphalting & fence
Building extension Works (steel building)
Gantry & outdoor equipment foundation
230kV OHTL
230kV double circuit TL Lattice Towers. About 54 nos of towers to be installed.
Route is going through desert area and major highway crossing is required.
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-78
| Contract No |
30631041/00 |
Project/Contract Title: |
Construction o f 115kV OHTL for Jubail- Secondary industries SS Including Protection & Communication Works |
Client Name: |
SEC-EOA |
Location |
Al Jubail |
Contract Start Date |
20-Nov-06 |
Completion Date |
10-Dec-09 |
Progress % |
50.54% |
Category: |
OHTL, Civil, T&C, |
Project Type |
Turnkey |
|
Scope of Work: |
Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouse(s) respectively, construct, install test and commission the required modification/additions to the protection, communication and SCADA equipment at Jubail Secondary Industries South (44BC) 115/3405kV S/S & Berri 230/115kV S/S in JIC in accordance with Scope of work and Technical Specifications, PTS-05EN125 and also construction of new 115kV double circuit overhead transmission line (including the installation of OPGW & U/G NFOC from the existing berri P/P to the existing Jubail Secondary Industries South 44BC S/S in accordance with the Scope of work and Technical Specifications, PTS-05ER118.
Project Portion – 1. Design, Procurement & construction of 7.5 km double circuit over head transmission line from Beri P/P to 44-BC transmission area using steel monopoles, ACSR “ Drake conductor 1-24 core OPGW & Conventional OPGW.
Project Portion – 2. Design, Procurement, & testing of line protection at both end of substation with extension & modification of SCADA, SOE & Fiber optic communication system
Civil Works – Jubail 11.5 kV OHL consists of 23 nos lattice steel towers, and 21 steel monopoles. The route length is 7.5 km and its is going in between other existing transmission lines in the same area
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-78
| Contract No |
30631040/00 |
Project/Contract Title: |
Construction o f 115kV OHTL for New Saihat SS |
Client Name: |
SEC-EOA |
Location |
Saihat |
Contract Start Date |
20-Nov-06 |
Completion Date |
10-05-09 |
Progress % |
57.54% |
Category: |
OHTL, Civil, T&C, SCADA |
Project Type |
Turnkey |
|
Scope of Work: |
Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts to the work site and company designated warehouses respectively, construct, install test and commission and put into service 115kV overhead transmission line and communication systems described below in accordance with the Scope of work and Technical Specifications, PTS-05EO127
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-79
| Contract No |
10631061/00 |
Project/Contract Title: |
Construction of 132/13.8 kV SS. No. 8139 At King Abdullah Area in Riyadh City |
Client Name: |
SEC-COA |
Location |
Riyadh |
Contract Start Date |
22-Nov-06 |
Completion Date |
25-Jul-09 |
Progress % |
48.47% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
|
Scope of Work: |
This is a turn key project and consists of supply installation, testing & commissioning
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-80
| Contract No |
10631060/00 |
Project/Contract Title: |
Reinforcement Of 132/33 Kv Ss No. 8705 At Al Kharj Area |
Client Name: |
SEC-COA |
Location |
Al Kharj |
Contract Start Date |
22-Dec-06 |
Completion Date |
25-Sep-09 |
Progress % |
74.74% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
|
Scope of Work: |
This is a turn key project and consists of supply ,installation, testing & commissioning of the following:
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-80
| Contract No |
10631059/00 |
Project/Contract Title: |
Construction of 132/33kV SS. No. 8065
At. Al Thumamah Area in Riyadh City |
Client Name: |
SEC-COA |
Location |
Al Thumamah - Riyadh |
Contract Start Date |
22-Nov-06 |
Completion Date |
25-Sep-09 |
Progress % |
79.79% |
Category: |
Mechnical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of supply ,installation, testing & commissioning of the following:
2 Nos – 132/33 kV 100 MVA Transformers.
Control & protection Equipment: ( 132kv Relay Panel,132kv control Panel)
Civil & mechanical works (Transformer Building)
1 sets 125 Battery & battery Charger .
300kv,33/0.22 kV auxiliary Transformers.
XLPE /CU/ 132 & 13.8kv Cables.
New SCADA System.
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-81
| Contract No |
20631040/00 |
Project/Contract Title: |
Reinforcement of 132 kV OHTL Between Al-Wajh S/S & Al-Ula S/S |
Client Name: |
SEC-WOA |
Location |
Al Ula |
Contract Start Date |
23-Dec-06 |
Completion Date |
23-Dec-08 |
Progress % |
63.45% |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :
Design & Engineering for the B/M Equipment
2. 132kv, 6-MVAR Shunt Reactor Along with Line Terminating Equipment
132KV SWITCHGEAR BAY – 2 Nos
Steel structure & support.
Foundation and civil works
Protection and control for Shunt Reactor
FR & SER
RTU FOR AL-ULA S/S
MICROSCADA EQUIPMENT FOR AL-WAJH S/S
AC distribution panel Modifications
LV & Control Cables
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-82
| Contract No |
30631089/00 |
Project/Contract Title: |
380 kV Substation Works Associated with Generation Expansion Project of PP-8 in Riyadh City (S/S 9021) |
Client Name: |
SEC-EOA |
Location |
Riyadh |
Contract Start Date |
25-Dec-06 |
Completion Date |
15-Dec-08 |
Progress % |
88.28% |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
380KV Gas Insulated Switchgear consisting of 14 Bays
Two Nos. 1500KVA, 4.16/ 0.220KV station service transformer
Two nos. 4.16/ 0.220KV Switchgear with Vacuum Circuit Breaker
220/127V AC auxiliary power system
DC auxiliary power system
Lighting and small power system as well as grounding and shielding systems
380KV metal oxide surge arrestors
380KV Coupling capacitive voltage transformer
380KV post insulators
380KV and Control buildings
Control and Relay Equipments
PLC/ SCADA and Teleprotection Signaling Equipments
Fire Detection and Fire alarm System
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-84
| Contract No |
20733005/00 |
Project/Contract Title: |
Construction of New 380/110Kv Al Thuwal BSP |
Client Name: |
SEC-WOA |
Location |
Al Thuwal |
Contract Start Date |
15-Aug-07 |
Completion Date |
15-Jun-09 |
Progress % |
57.56 |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
380/110 k.V. Thuwal BSP:
380 k.V. GIS
110 k.V. GIS
500 MVA Power Transformer.
Control & Protection of 380/110 k.V. System.
Telecommunication System.
SCADA, SOE & TFR System.
Remote Ends ( Rabigh – 1380 k.V. S/S, HVE 280 k.V. S/S)
Protection Modification.
SCADA & Telecommunication System.
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-85
| Contract No |
10731045/00 |
Project/Contract Title: |
Construction of New 132/13.8KV S/Stn No. 8905 at Al Maseef Area, Hail City |
Client Name: |
SEC-COA |
Location |
Al Maseef Area, Hail City |
Contract Start Date |
17-Feb-08 |
Completion Date |
16- Mar-10 |
Progress % |
5% |
Category: |
|
Project Type |
Turnkey |
Request for more details pertaining to this project – psmd@alfanar.com |
PE-86
| Contract No |
20733005/00 |
Project/Contract Title: |
Construction of new 380KV S/S and works Associated with Integration Phase-1 of Rabigh (2) Power Plant (Stage 1) |
Client Name: |
SEC-WOA |
Location |
Rabigh |
Contract Start Date |
12-Nov-07 |
Completion Date |
12-Oct-09 |
Progress % |
17.17% |
Category: |
|
Project Type |
Turnkey |
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-87
| Contract No |
TS-1182 |
Project/Contract Title: |
Construction of 132/13.8kV Substation No. 8133 , alfanar Industrial Area |
Client Name: |
SEC-COA |
Location |
|
Contract Start Date |
1-Jan-08 |
Completion Date |
12-Mar-10 |
Progress % |
9% |
Category: |
|
Project Type |
|
|
Request for more details pertaining to this project – psmd@alfanar.com
> |
|
PE-88
| Contract No |
40721056/00 |
Project/Contract Title: |
Sharourah Power Plant Extension Project |
Client Name: |
SEC-South |
Location |
Sharourah |
Contract Start Date |
15-Mar-08 |
Completion Date |
15-Feb-10 |
Progress % |
1% |
Category: |
|
Project Type |
Turnkey |
Request for more details pertaining to this project – psmd@alfanar.com |
|
PE-89
| Contract No |
TE-1166 |
Project/Contract Title: |
Additional Power Supply to KFU Al Hassa |
Client Name: |
KFU |
Location |
Al Hassa |
Contract Start Date |
15-Jan-08 |
Completion Date |
….. |
Progress % |
….. |
Category: |
Turnkey |
Project Type |
|
Request for more details pertaining to this project – psmd@alfanar.com |
|
| | |