Eastern Province Projects

On-going Projects:

 

 

 

PE-63            

Contract No

30441103/00

Project/Contract Title:

Reinforcement Of 1st. Dammam Industrial city 69/13.8 Kv Ss # 2.

Client Name:

SEC-EOA

Location

Dammam

Contract Start Date

05-May-05

Completion Date

05-Sep-08

Progress %

95%

Category:

Mechanical, Civil, T&C, SCADA, E&I

Project Type

Turnkey

Scope of Work:

Extension of existing 69kV Outdoor Type Substation with one transformer bay which includes the following :-

  • 69/13.8kV Power Transformer 30/40MVA
  • 60kV Outdoor type Surge Arresters
  • 69kV Circuit Breaker, Disconnect Switches
  • 69kV CTs, VTs and wall bushing - 13.8kV Switchgear 2000A
  • 13.8kV LV and Control Cables
  • Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

     

    PE-66

    Contract No

    30431070/00

    Project/Contract Title:

    Juaymah Area Reinforcement (Phase Ii)

    Client Name:

    SEC-EOA

    Location

    Juaymah

    Contract Start Date

    30-Jul-05

    Completion Date

    29-May-09

    Progress %

    87.31%

    Category:

    Mechanical, Cable, Civil, T&C, SCADA, E&I

    Project Type

    Turnkey

    Scope of Work:

    This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-

  • 115kV, 14 Nos bays - 115kV cables,
  • protection & control,
  • protection modification at 230kV Ghazlan & Juaymah NGL S/S, 
  • Transmission Line
  • Request for more details pertaining to this project – psmd@alfanar.com

     

     


     

     

    PE-67

    Contract No

    27

    Project/Contract Title:

    69/13.8kV S/Stn # 2 Distribution Feeders to KFU Substation tn# 4

    Client Name:

    KFU

    Location

    …….

    Contract Start Date

    14-Oct-05

    Completion Date

    …….

    Progress %

    96.23%

    Category:

    Mechanical, Civil, T&C, SCADA, E&I

    Project Type

    Turnkey

    Scope of Work:

    This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-

  • 69kV, 4 Nos. GIS bays
  • Two transformer 40MVA cable feeders complete with 13.8kV protection and control,
  • Civil and electromechanical work for the complete substation.
  • The new S/Stn will remotely controlled by SCADA system from the company power control
  • Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

     

    PE-68

    Contract No

    20431074/00

    Project/Contract Title:

    Construction Of The New Al-Sharaieh 110/13.8 Kv S/S

    Client Name:

    SEC-WOA

    Location

    Al-Sharaieh

    Contract Start Date

    18-Feb-06

    Completion Date

    15-June-08

    Progress %

    93.8%

    Category:

    Mechanical, Civil, T&C, Scada, E&I

    Project Type

    Turnkey

    Scope of Work:

    This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-

  • 40MVA Power Transformer
  •      
  • HV / MV / Control Cables
  •      
  • AVC Panels
  •      
  • SCADA & Telecom
  • Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

     

     

    PE-69

    Contract No

    30131003/00

    Project/Contract Title:

    Power supply to Haradh Crude Increment II

    Client Name:

    SEC-EOA

    Location

    Haradh

    Contract Start Date

    23-Feb-06

    Completion Date

    19-Apr-08

    Progress %

    98%

    Category:

    Mechanical, Civil, T&C, SCADA, E&I

    Project Type

    Turnkey

    Scope of Work:

    This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning for the left over portion of the work by terminated contractor M/s Gulf Potential and includes the following :-

  • AC / DC Distribution System
  • Protection System
  • SCADA
  • Grounding, Lighting, Transmission Line
  • Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

     

    PE-69

    Contract No

    30531144/00

    Project/Contract Title:

    Construction of 115/13.8 kV Al-Masoudi S/S

    Client Name:

    SEC-EOA

    Location

    Al-Masoudi

    Contract Start Date

    23-Feb-06

    Completion Date

    30-Nov-08

    Progress %

    66%

    Category:

    Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping

    Project Type

    Turnkey

    Scope of Work:

    This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-

  • 115kV GIS Bays
  •      
  • 115/13.8kV Power Transformers
  •     
  • 13.8kV Switchgear Line Up
  •      
  • 115kV Surge Arresters (Outdoor)
  •      
  • Control, Protection and Metering for complete substation
  •      
  • Medium density Fiber Optic Equipment
  •      
  • SCADA System
  •      
  • Civil work complete including buildings, trenches, etc
  •      
  • Mechanical, complete works
  •      
  • Indoor / Outdoor lighting works
  • Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

     

    PE-74

    Contract No

    30631036/00

    Project/Contract Title:

    Construction of New Saihat 115/13.8kV Substation

    Client Name:

    SEC-EOA

    Location

    Saihat

    Contract Start Date

    20-Nov-06

    Completion Date

    11-Jan-09

    Progress %

    52.13%

    Category:

    Mechanical, Civil, T&C, SCADA, E&I, Piping

    Project Type

    Turnkey

    Scope of Work:

     

     

  • Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouse's) respectively, construct, install test and commission and put into service new Saihat 115/13.8kV S/S # 2 and the associated modifications to Al Dhahiyan 380/115kV bulk supply point (BSP) S/S as described below in accordance with the Scope of work and technical specifications, PTS-05EN122:
  •  

  • Request for more details pertaining to this project – psmd@alfanar.com
  •  


     

     

     

    PE-75

    Contract No

    30631037/00

    Project/Contract Title:

    Construction of HIE 115/13.8kV SS#2 & Modification of 13.8 kV Switchgear @RWPS SS

    Client Name:

    SEC-EOA

    Location

    …….

    Contract Start Date

    20-Nov-06

    Completion Date

    11-Feb-09

    Progress %

    63.36%

    Category:

    Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping

    Project Type

    Turnkey

    Scope of Work:

    Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouses respectively, construct, install test and commission and put into service Hassa Industrial Estate (hereafter referred to as H.I.E) 115/13.8kV S/S-2 and the associated modifications to existing H.I.E 115/13.8kV S/S and Al Uyun 115/13.8kV S/S and new 13.8kV Switchgear and the associated modifications to existing RWPS 3C line valve #6 115/13.8kV S/S as described below in accordance with the Scope of work and Technical Specification, PTS-05EN128 and PTS-05EM129. The work consists of the following project portions.

    Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

     

     

    PE-76

    Contract No

    30631038/00

    Project/Contract Title:

    Construction of New Al Qadisiyyah 115/13.8kV SS

    Client Name:

    SEC-EOA

    Location

    Al Qadisiyyah

    Contract Start Date

    20-Nov-06

    Completion Date

    11-Dec-08

    Progress %

    36.5%

    Category:

    Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping

    Project Type

    Turnkey

    Scope of Work:

    Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouse's) respectively, construct, install test and commission and put into service new Al Qadisiyyah 115/13.8kV SS and the modification to existing North Mubaraaz 115/13.8kV S/S and Hasa Home Ownership 115/13.8kV S/S as described below in accordance with the scope of work and Technical Specifications, PTS-05EN120:

    Request for more details pertaining to this project – psmd@alfanar.com

     


     

     

    PE-77

    Contract No

    30633046/00

    Project/Contract Title:

    Power Supply to Saudi Aramco East West- Pump Station  3 (SS & OHL)

    Client Name:

    SEC-EOA

    Location

    ……

    Contract Start Date

    20-Nov-06

    Completion Date

    11-Oct-08

    Progress %

    74.67%

    Category:

    Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping

    Project Type

    Turnkey

    Scope of Work:
  • Contractor shall design, engineer, procure supply and deliver all equipment and materials including operational spare parts and special equipment and / or tools to the work site and company designated warehouse(s) respectively, construct, install, test and commission the following:
  • Project Portion – 1. Design, Supply, Installation & testing of 230kV Wasia substation expansion by 3 no 230 kV circuit  breaker with Ct, S, 6 Nos 230 kV disconnector, port insulation AC/DC auxiliary protector & control and communication system along with expansion of SCADA, SDE & Fault recorder
  • The scope includes protection system enunciator & SOE expansion at Saudi Aramco E/W pumping station #3 for the related lines with Wasia Project Portion – 2. Design, Procurement & construction of 230kV(16.65 kilometers) double
  • Circuit lattice Steel overhead transmission line with 2 OPGW from Wasia 230kV substation to East west pump station # 3 S/S
  • Civil works. 230kV Substation portion.
  • Site development of existing Substation by now asphalting & fence
  • Building extension  Works (steel building)
  • Gantry & outdoor equipment foundation
  • 230kV OHTL
  • 230kV double circuit TL Lattice Towers. About 54 nos of towers to be installed.
  • Route is going through desert area and major highway crossing is required.
  • Request for more details pertaining to this project – psmd@alfanar.com
  •  


     

     

     

    PE-78

    Contract No

    30631041/00

    Project/Contract Title:

    Construction o f 115kV OHTL for Jubail- Secondary industries SS Including Protection & Communication Works

    Client Name:

    SEC-EOA

    Location

    Al Jubail

    Contract Start Date

    20-Nov-06

    Completion Date

    10-Dec-09

    Progress %

    50.54%

    Category:

    OHTL, Civil, T&C,

    Project Type

    Turnkey

    Scope of Work:
  • Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and or tools to the work site and company designated warehouse(s) respectively, construct, install test and commission the required modification/additions to the protection, communication and SCADA equipment at Jubail Secondary Industries South (44BC) 115/3405kV S/S & Berri 230/115kV S/S in JIC in accordance with Scope of work and Technical Specifications, PTS-05EN125 and also construction of new 115kV double circuit overhead transmission line (including the installation of OPGW & U/G NFOC from the existing berri P/P to the existing Jubail Secondary Industries South 44BC S/S in accordance with the Scope of work and Technical Specifications, PTS-05ER118.
  • Project Portion – 1. Design, Procurement & construction of 7.5 km double circuit over head transmission line from Beri P/P to 44-BC transmission area using steel monopoles, ACSR “ Drake conductor 1-24 core OPGW &  Conventional OPGW.
  • Project Portion – 2. Design, Procurement, & testing of line protection at both end of substation with extension & modification of SCADA, SOE & Fiber optic communication system
  • Civil Works – Jubail 11.5 kV OHL consists of 23 nos lattice steel towers, and 21 steel monopoles. The route length is 7.5 km and its is going in between other existing  transmission lines in the same area
  • Request for more details pertaining to this project – psmd@alfanar.com
  •  


     

     

     

    PE-78

    Contract No

    30631040/00

    Project/Contract Title:

    Construction o f 115kV OHTL for New Saihat SS

    Client Name:

    SEC-EOA

    Location

    Saihat

    Contract Start Date

    20-Nov-06

    Completion Date

    10-05-09

    Progress %

    57.54%

    Category:

    OHTL, Civil, T&C, SCADA

    Project Type

    Turnkey

    Scope of Work:
  • Contractor shall design, engineer, procure, supply and deliver all equipment and materials including operational spare parts to the work site and company designated warehouses respectively, construct, install test and commission and put into service 115kV overhead transmission line and communication systems described below in accordance with the Scope of work and Technical Specifications, PTS-05EO127
  • Request for more details pertaining to this project – psmd@alfanar.com
  •  


     

     

    PE-79

    Contract No

    10631061/00

    Project/Contract Title:

    Construction of 132/13.8 kV SS. No. 8139 At King Abdullah Area in Riyadh City

    Client Name:

    SEC-COA

    Location

    Riyadh

    Contract Start Date

    22-Nov-06

    Completion Date

    25-Jul-09

    Progress %

    48.47%

    Category:

    Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping

    Project Type

    Turnkey

     Scope of Work:
  • This is a turn key project and consists of supply installation, testing & commissioning
    Request for more details pertaining to this project – psmd@alfanar.com
  •  


     

     

    Completed Projects:

     

     

    PE-62

    Contract No

    30441079/00

    Project/Contract Title:

    Construction Of New Skaka Industrial 33/13.8KV ss

    Client Name:

    SEC-EOA

    Location

    Skaka

    Contract Start Date

    1/10/05

    Completion Date

    07/03/08

    Category:

    Mechanical, Cable, Civil, T&C, SCADA, E&I

    Sector

    Mechanical, Cable, Civil, T&C, SCADA, E&I

    Project Type

    Turnkey

    Scope of Work:

    This is turnkey project and consist of engineering & design, supply, installation, testing & commissioning ofthe following :-

  • 5bays       33kV Switchgear, 1250A
  • 2 Nos        20/25MVA, 33/13.8kV Power Transformer
  • 13bay       13.8kV Switchgear, 2000A
  • 1 Lot         33/13.8kV Cables & terminations
  • 2 bays      Extension of 33kV Switchgear at Al Jouf source S/S
  • 1 Lot         SCADA & Telecom, SOE, Annunciators, 33 control panels, relay panels
  • 1 Lot         380V AC distribution board, batteries, DC distribution boards,
  • 1 Lot         Ring Main Unit
  • Request for complete details pertaining to this project – psmd@alfanar.com

  •  

     

    Back to Projects

     

           
     
    Our Commitment

    Our Commitment

    Photo Gallery

    Photo Gallery

    Affiliated Business Units

    Affiliated Business Units