Projects
On-going Projects | Completed Projects | Prestigious Projects | Regionwise Projects
Completed Projects
PE-01
| Contract No |
Nil |
| Project/Contract Title: |
Farasan Island Electrification Project |
| Client Name: |
Electricity Corporation |
| Location |
Farasan Island |
| Contract Start Date |
1979 |
| Completion Date |
1981 |
| Category: |
OHTL |
| Sector |
OHTL |
| Project Type |
Turnkey |
| Scope of Work: |
Installation & commissioning of 80km. 13.8kv distribution network, 59 km L.V. distribution network.
Substation Transformers and 700 consumer connections.
|
|
PE-02
| Contract No |
Nil |
| Project/Contract Title: |
Fire Brigade Buildings Riyadh & Dammam |
| Client Name: |
National Guard |
| Location |
Riyadh & Dammam |
| Contract Start Date |
1978 |
| Completion Date |
1979 |
| Category: |
Civil |
| Sector |
Civil |
| Project Type |
Turnkey |
Scope of Work:
|
Construction of offices, residence with messing facilities, theater & parking space totaling an area of 700 square meters. |
|
PE-02
| Contract No |
Nil |
| Project/Contract Title: |
Four Schools In Wadi Al-dawasir |
| Client Name: |
Ministry of Education |
| Location |
Al-Dawasir |
| Contract Start Date |
1979 |
| Completion Date |
1981 |
| Category: |
Mechanical – Civil |
| Sector |
Mechanical – Civil |
| Project Type |
Turnkey |
| Scope of Work: |
Construction of school building for 12 classrooms, offices, messing facilities, tennis court, garden, lighting and installation of air-condition & telephone system.
|
|
PE-03
| Contract No |
Nil |
| Project/Contract Title: |
Sajir Electrification Project |
| Client Name: |
Electric Corporation |
| Location |
Sajir |
| Contract Start Date |
1981 |
| Completion Date |
1983 |
| Category: |
Mechanical, OHTL, Generation, Civil, SCADA |
| Sector |
Mechanical, OHTL, Generation, Civil, SCADA |
| Project Type |
Turnkey |
| Scope of Work: |
This is a turnkey project involving construction of a power station with associated distribution network.
- Construction of powerhouse building for 7800 KW diesel generating units, accommodation building for operation &maintenance personnel, drainage system, water system, roads, wells etc.
- Supply & installation of 800 Cu.m. Fuel tank including necessary piping and control system.
- Supply & installation of water treatment plant including interconnecting pipes.
- Supply & installation of fire fighting & detection systems.
- Supply & installation of power station telephone system, indoor & outdoor lightings including cabling works.
Construction of 13.8kV/220V distribution network consisting approx. of the following :
- 6,000 steel poles for 13.8kv network, 1,700 steel poles for 220v network, 600 km route length of 13.8kv network, 100 km route length of 220v network, 200 units’ distribution transformers and 900 units’ electric meters.
- Design & engineering were done by Alfanar engineers. Installations / erections were done by Alfanar manpower. Commissioning was supervised by Alfanar engineers.
|
|
PE-04
| Contract No |
NA - Sub Contractor |
| Project/Contract Title: |
Dammam - Dahran Highway Lighting |
| Client Name: |
Ministry of Transportation |
| Location |
Dammam - Dahran |
| Contract Start Date |
1981 |
| Completion Date |
1983 |
| Category: |
OHTL, Civil, SCADA |
| Sector |
OHTL, Civil, SCADA |
| Project Type |
Turnkey |
| Scope of Work: |
Installation, testing and commissioning of lighting network of Dammam, Dahran - Alkhobar dual carriage way, section 2 & 3 including 40 meter masts, lighting poles, pad mounted transformers, Earthing and
Cabling. Civil work include foundations for the lighting masts
|
|
PE-05
| Contract No |
Nil |
| Project/Contract Title: |
Al-Aqiq (Al-Baha). |
| Client Name: |
SCECO-South |
| Location |
Al Baha |
| Contract Start Date |
1983 |
| Completion Date |
1984 |
| Category: |
OHTL, Electrical & Instrumentation |
| Sector |
OHTL, Electrical & Instrumentation |
| Project Type |
Turnkey |
| Scope of Work: |
Installation & commissioning of 76 km. 33kV transmission line, L.T. distribution network including transformers and consumer services. Overall engineering and design was performed by Alfanar which
includes pole & cross arm strength calculations, voltage drop calculations and sizing of conductors, SAG & tension calculations, determination of poles planting depth, preparation of structures drawing and staking sheets. Wooden poles were used in the project and procured abroad. Commissioning was performed by Alfanar engineers
|
|
PE-06
| Contract No |
Nil |
| Project/Contract Title: |
Taif Distribution Network O.H. And U/G |
| Client Name: |
SCECO-West |
| Location |
Taif |
| Contract Start Date |
1984 |
| Completion Date |
1984 |
| Category: |
OHTL, Electrical & Instrumentation |
| Sector |
OHTL, Electrical & Instrumentation |
| Project Type |
Turnkey |
| Scope of Work: |
Installation, testing and commissioning of lighting network of Dammam, Dahran - Alkhobar dual carriage way, section 2 & 3 including 40 meter masts, lighting poles, pad mounted transformers, earthing and cabling. Civil work include foundations for the lighting masts
|
|
PE-07
| Contract No |
Sub Contractor |
| Project/Contract Title: |
Wadi Bin Hash Bal Distribution Project |
| Client Name: |
Sceco South |
| Location |
Wadi Bin Hash Bal |
| Contract Start Date |
1984 |
| Completion Date |
1985 |
| Category: |
OHTL, Electrical & Instrumentation |
| Sector |
OHTL, Electrical & Instrumentation |
| Project Type |
Sub Contractor |
| Scope of Work: |
Installation and commissioning of 3000 km. distribution network including 33 kV line, low—tension distribution network with transformers and consumer services.
|
|
PE-08
| Contract No |
Sub Contractor |
| Project/Contract Title: |
Sarat Obeidah Distribution Project |
| Client Name: |
Sceco South |
| Location |
Sarat |
| Contract Start Date |
1984 |
| Completion Date |
1984 |
| Category: |
Electrical & Instrumentation |
| Sector |
Electrical & Instrumentation |
| Project Type |
Sub Contractor |
| Scope of Work: |
Installation and commissioning of 300km. high-tension main and lateral lines and installation of 5000 consumer services.
|
|
PE-09
| Contract No |
34/5/C |
| Project/Contract Title: |
Supervisory Control And Data Acquisition (Scada) For Layla Aflaj |
| Client Name: |
Electricity Corporation |
| Location |
Wadi Dawasir |
| Contract Start Date |
1985 |
| Completion Date |
1989 |
| Category: |
Scada, Automation, Telecom |
| Sector |
Scada, Automation, Telecom |
| Project Type |
Turneky |
| Scope of Work: |
Supply, installation, commissioning , warranty and maintenance of SCADA system consisting of Dua computers, master
stations, control consoles, color VDU’s, printers, mimic wallboards, RTU’s test, RTU and mock S/S. Engineer’s console including multicolor cabling for monitoring and controlling 300,000 km. of H.T. transmission networks s/s for Layla Aflaj &Wadi Dawasir regions.
PE-09B MOBILE RADIO SYSTEM LAYLA AFLAJ
Turnkey contract to supply, install and commission a mobile radio network. This region has three repeater stations linked with UHF stations together with two radio VHF base stations which are connected through PLC to the control center. Repeaters are remotely located and powered by solar system. Since the terrain is hilly in most part of the region, radio coverage was not possible by normal VHF base stations. Hence, hill top repeaters were installed. Beside the base stations, there is a fixed mobile station which gives general alarm condition to the control center from the substation.
PE-09C MOBILE RADIO SYSTEM LAYLA AFLAJ
Supply, installation, commissioning warranty and maintenance of mobile radio system consisting of micro-processor based control system, VHF stations, UHF stations, fixed mobiles and car mobiles for Layla Aflaj, Wadi Dawasir regions and remote regions of Alsawada called Naufaud Al DUHL
|
|
PE-11
| Contract No |
LOT-5/ Group C |
| Project/Contract Title: |
Hail Electrification Project Lot -5 |
| Client Name: |
Electricity Corporation |
| Location |
Hail |
| Contract Start Date |
1986 |
| Completion Date |
1989 |
| Category: |
Scada, Automation, Telecom, E&I |
| Sector |
Scada, Automation, Telecom, E&I |
| Project Type |
Turneky |
| Scope of Work: |
This project was earlier awarded to a foreign firm but ran into problems and abandoned the project abruptly. The remaining works were then floated for tender by EC in which Alfanar was the successful
bidder and eventually bagged the contract.
The original scope of work awarded to the 1st contractor comprised of the following :
240 KMS. Of 33kV overhead lines on lattice towers, 860 KMS. Of 13.8kV overhead lines on steel poles.
4700 Nos. house connections. 7 Nos. 30 MVA substitutions.
|
|
PE-15
| Contract No |
Sub Contractor |
| Project/Contract Title: |
Al Aqiq (Al Baha) Water Supply Project |
| Client Name: |
M O A W |
| Location |
Al Baha |
| Contract Start Date |
1986 |
| Completion Date |
1989 |
| Category: |
OHTL |
| Sector |
OHTL |
| Project Type |
Turneky |
| Scope of Work: |
Supply and erection of 33kV sub-transmission line to new water system pumping station to connect al Aqiq & Al Baha waterline to work in systematic operation.
|
|
PE-16
| Contract No |
33/1/2/C |
| Project/Contract Title: |
Tabouk Regional Electrification Project 132 Kv S/S Duba , Bida, Haql |
| Client Name: |
Electric Corporation |
| Location |
Tabouk |
| Contract Start Date |
1987 |
| Completion Date |
1988 |
| Category: |
Mechanical |
| Sector |
Mechanical |
| Project Type |
Turneky |
| Scope of Work: |
The project included provision for lighting, heating, ventilation and, air-conditioning of the main contract executed by another firm.
|
|
PE-17
| Contract No |
7/12/408 |
| Project/Contract Title: |
Gas Turbine Project Extension Of Air Defense Power At Jeddah |
| Client Name: |
MODA |
| Location |
Jeddah |
| Contract Start Date |
1988 |
| Completion Date |
1989 |
| Category: |
Mechanical, Generation, Civil, SCADA, E&I, Piping |
| Sector |
Mechanical, Generation, Civil, SCADA, E&I, Piping |
| Project Type |
Turneky |
| Scope of Work: |
This project mainly involve the relocation of a 12.5 MW SK20 Rolls Royce Gas Turbine from old Airport, Jeddah to Air Defense Institute in Jeddah. The following were done by Alfanar.
- Foundations for the gas turbine and fuel storage tanks.
- Construction of powerhouse building, dikes and trenches.
-Dismantling and transport of gas turbine and auxiliaries.
-Overhauling of turbine section, generator and turbine auxiliaries. Overhauling was done at manufacturers works in U.K.
- Re-installation, testing & commissioning of the gas turbine and auxiliaries.
-Supply, installation, testing and commissioning of 5 x 600 m3 fuel storage tanks complete with inter-connecting pipes, fire fighting system for the gas turbine and fuel tanks.
-Supply, installation, testing and commissioning of 13.8kV switchgear, neutral breaker, earthing systems and high masts lighting.
- Supply, installation, testing and commissioning of remote control panel and local control system.
- Design and engineering was performed by Alfanar engineers. Testing and commissioning of the gas turbine and auxiliaries was supervised by the manufacturer. The project was completed on time. |
|
PE-18
| Contract No |
3/M/88 |
| Project/Contract Title: |
Modification Of Sub-transmission And Distribution 13.8kv Network A.D.I.-Jeddah |
| Client Name: |
MODA |
| Location |
Jeddah |
| Contract Start Date |
1988 |
| Completion Date |
1989 |
| Category: |
OHTL, E&I |
| Sector |
OHTL, E&I |
| Project Type |
Turneky |
| Scope of Work: |
Installation and commissioning of 13.8KV H.T. switchgear, underground H.T. and control cables, termination and jointing, moving H.T. switchgear and installation new bus tie to complete loop system. |
|
PE-19
| Contract No |
Nil |
| Project/Contract Title: |
Hail Water Works Power Supply 13.8 kV Distribution. |
| Client Name: |
Electric Corporation |
| Location |
Hail |
| Contract Start Date |
1989 |
| Completion Date |
…… |
| Category: |
Testing & Com., E & I |
| Sector |
Testing & Com., E & I |
| Project Type |
Turneky |
| Scope of Work: |
installation and commissioning of 30 km. 13.8 KV distribution line including 500 KVA S/S and distribution transformers. |
|
PE-20
| Contract No |
23/10/5 |
| Project/Contract Title: |
Construction Of 40 Mw Power Plant In Qurayat |
| Client Name: |
Electric Corporation |
| Location |
Qurayat |
| Contract Start Date |
1989 |
| Completion Date |
1992 |
| Category: |
Mechanical, Generation, Civil, E&I, Piping |
| Sector |
Mechanical, Generation, Civil, E&I, Piping |
| Project Type |
Turneky |
| Scope of Work: |
This project mainly involved the dismantling transportation and re-installation of 2 x 20 MW BBC type 9 gas turbines complete with auxiliary systems. The gas turbines were taken out from SCECO Central’s Alkharj P/P |
|
PE-21
| Contract No |
ENG/YAN/ 1037 |
| Project/Contract Title: |
110kv Overhead Transmission Lines In Yanbu, Al Bahar |
| Client Name: |
SCECO WEST |
| Location |
Yanbu – Al Babar |
| Contract Start Date |
1991 |
| Completion Date |
1992 |
| Category: |
OHTL, Civil, T&C, SCADA, E&I |
| Sector |
OHTL, Civil, T&C, SCADA, E&I |
| Project Type |
Turneky |
| Scope of Work: |
This was a turnkey project involving construction of 8.50 km 4 circuit configuration 110 KV transmission line. The new line was looped on existing double-circuit line. |
|
PE-22
| Contract No |
ENG/MED 1051 |
| Project/Contract Title: |
Relocation Of 110 Kv Power & Pilot Cables On 2nd Ring Road, Medina |
| Client Name: |
SCECO WEST |
| Location |
Medina |
| Contract Start Date |
1991 |
| Completion Date |
1992 |
| Category: |
Cable, Civil, T&C, SCADA |
| Sector |
Cable, Civil, T&C, SCADA |
| Project Type |
Turneky |
| Scope of Work: |
This was a turnkey project including the relocation of portion of existing 110 KV oil-filled underground cables. The existing line was cut and joined at specific points. |
|
PE-23
| Contract No |
ENG/MAK/ 1080 |
| Project/Contract Title: |
110 kV Overhead Transmission Lines, Arafat, Makkah |
| Client Name: |
SCECO-West |
| Location |
Arafat, Makkah |
| Contract Start Date |
1991 |
| Completion Date |
1992 |
| Category: |
OHTL, Civil, T&C, SCADA |
| Sector |
OHTL, Civil, T&C, SCADA |
| Project Type |
Turneky |
| Scope of Work: |
This was a turnkey project involving construction of 7 km. double circuit configuration 110 KV transmission line. The new line portion was traversed through the mountain area and reconnected to the original line at certain points |
|
PE-24
| Contract No |
31/MIM/91 |
| Project/Contract Title: |
Battery 117 Permanent Power Supply |
| Client Name: |
MODA |
| Location |
..... |
| Contract Start Date |
1992 |
| Completion Date |
1993 |
| Category: |
Civil, T&C, E&I |
| Sector |
Civil, T&C, E&I |
| Project Type |
Turneky |
| Scope of Work: |
installation and commissioning of 5 package unit substation 2x2500 KVA step-up transformers, 1 x 500 KVA step-up transformers, SF6 switchgear, 2 km. 13.8 XLPE cable, multi core cabling and construction of main substation building. Civil work includes foundation for the transformers and cable trench for 13.8kV cables. |
|
PE-25
| Contract No |
90PO194 |
| Project/Contract Title: |
Early Warning For Fuel Leakage At K.K.I.A. - Jeddah |
| Client Name: |
SAMAREC |
| Location |
Jeddah |
| Contract Start Date |
1992 |
| Completion Date |
1993 |
| Category: |
Turnkey |
| Sector |
Civil, Electrical & Instrumentation |
| Project Type |
Civil, Electrical & Instrumentation |
| Scope of Work: |
Installation and commissioning of 31 Nos. level transmitter relay cabinet and cables, including civil works for manholes |
|
PE-26
| Contract No |
ENG/MAK 1091-2 |
| Project/Contract Title: |
132 Kv Xlpe Cables For The Substation At Haram & Misfalah |
| Client Name: |
SCECO WEST |
| Location |
Haram & Misfalah |
| Contract Start Date |
1992 |
| Completion Date |
1994 |
| Category: |
Civil, T&C, SCADA |
| Sector |
Civil, T&C, SCADA |
| Project Type |
Turnkey |
| Scope of Work: |
This was a turnkey project involving installation of new 132 KV XLPE cables, pilot cables and cable accessories. |
|
PE-27
| Contract No |
NIL |
| Project/Contract Title: |
Operation & Maintenance New Qurayat Power Plant |
| Client Name: |
Electricity Corporation |
| Location |
Qurayat |
| Contract Start Date |
1992 |
| Completion Date |
1993 |
| Category: |
Mechanical, Generation, Piping |
| Sector |
Mechanical, Generation, Piping |
| Project Type |
Turnkey |
| Scope of Work: |
Operation & maintenance staff and engineers to run and maintain the Alfanar installed Power Plant. Mainly responsible for the following :-
- Maintenance of gas turbine 2 x 20MW.
- Maintenance of Diesel Generator 1 x 2.5MW.
-Maintenance of fuel system (unloading, forwarding, fuel treatment plant).
- Fire fighting system.
- Water treatment plant
- Water supply system
- Electrical & central system for the above installation |
|
PE-29
| Contract No |
35-1/1/15 |
| Project/Contract Title: |
132 Kv/ 13.8 Kv Substation Project Iskan Al-aam |
| Client Name: |
Real Estate Dev. Fund |
| Location |
Iskan Al-aam |
| Contract Start Date |
Oct. 1994 |
| Completion Date |
Jun 1996 |
| Category: |
Mechanical, Civil, T&C, SCADA, E&I |
| Sector |
Mechanical, Civil, T&C, SCADA, E&I |
| Project Type |
Turnkey |
| Scope of Work: |
This was a turnkey project for a new 132/13.8 KV indoor substation. The following are scope of work:
- Complete engineering and design of the whole substation including interface engineering.
- Civil works which includes construction of 2-story substation building plus basement with boundary walls, roads, lighting, foundations etc. The building is equipped with HVAC and fire fighting systems using FM 200 Gas.
Supply installation, testing and commissioning of the following equipment :-
- 7 bays 132 KV gas insulated switchgear (GIS), 24 bays 13.8 KV double busbar switchgear complete with bus duct., 1 lot neutral earthing resistor and 1 lot protection and control system., Complete substation earthing system and auxiliary system which includes 125 V DC system, auxiliary transformers, AC/DC panel boards.
- Complete closed-loop commissioning of the substation. |
|
PE-30
| Contract No |
12/1/16 |
| Project/Contract Title: |
Relocation of Pumping Station – OHL Gantry |
| Client Name: |
SCECO WEST |
| Location |
….. |
| Contract Start Date |
26/6/1995 |
| Completion Date |
04/1/1996 |
| Category: |
OHTL, Civil, E&I |
| Sector |
OHTL, Civil, E&I |
| Project Type |
Turnkey |
| Scope of Work: |
Supply and installation of two (2) towers, gantry, conductors, insulators and re-installation of surge arresters, CTs, VTs, line traps and associated equipment. Civil works include foundation for the towers and gantry. |
|
PE-31
| Contract No |
82520/00 |
| Project/Contract Title: |
Al-Khafji 115/13.8 kV S/S No. 3 and Associated Modifications. |
| Client Name: |
SCECO EAST |
| Location |
Al Khafji |
| Contract Start Date |
Apr.1996 |
| Completion Date |
14-04-1999 |
| Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
| Sector |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
| Project Type |
Turnkey |
| Scope of Work: |
- This is a turnkey project for a new 115 /13.8KV indoor substation. The following are scope of work
- Complete engineering and design of the whole substation including interface engineering.
-Civil works which includes construction of substation building with perimeter fence, roads, lighting, foundations etc. The building is equipped with HVAC & fire-fighting systems using alarm and detection.
- 2 x 40 MVA power transformers. |
|
PE-33
| Contract No |
47/4/-/1/A |
| Project/Contract Title: |
Al-Jouf Network Control Center Up-grade. |
| Client Name: |
SEC-CRB |
| Location |
Al Jouf |
| Contract Start Date |
17/5/1997 |
| Completion Date |
30/8/2000 |
| Category: |
T&C, SCADA, E&I |
| Sector |
T&C, SCADA, E&I |
| Project Type |
Turnkey |
| Scope of Work: |
Design review , installation and commissioning of :
- Application processors.
Communication processors.
- Local Area Network - Fiber Optic FDDI with DAS.
- Workstations and replacement of 18 nos. RTU’s.
- Modification of existing 17 Nos. substations for SCADA up gradation.
- EMS software engineering including database loading, graphic generation, alarm configuration, energy calculations, historical storage, report generation and information storage and retrieval |
|
PE-34
| Contract No |
36/1/16 |
| Project/Contract Title: |
Wadi Jaleel 380/110kv Outdoor Substation Project In Makkah |
| Client Name: |
SEC-WRB |
| Location |
Makkah |
| Contract Start Date |
03/4/1997 |
| Completion Date |
01/4/2000 |
| Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
| Sector |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
| Project Type |
Turnkey |
| Scope of Work: |
CONSTRUCTION & COMMISSIONING OF :
- 8 bays 380 kV outdoor switchgear comprising of 8 Nos. 3 pole SF6 circuit breakers complete with disconnections, current transformer, voltage transformer, surge arresters, line traps etc.
- 25 bays 110kV outdoor switchgear comprising of 25 Nos. 3 pole SF6 circuit breakers complete with disconnections, current transformers, voltage transformers, surge arresters, line traps etc..
- Complete busbar system for 380/110kV switchgear.
- 40 bays 13.8kV double bus bar switchgear.
-Control & protection system comprising of 49 Nos. 380/110/13.8 kV relay panels, 380/110kV fault recording system, Mosaic control panel board with control metering and alarm facilities plus other control equipment.
THIS IS VERY SPECIAL PROJECT WHICH alfanar IS PROUD TO EXECUTE. IT IS THE FIRST ONE OF IT’S KIND AS 380KV O/D S/S IN THE KINGDOM AND IN THE GULF. IT IS ALSO HIGHLY ADVANCED WITH THE LATEST TECHNOLOGY IN THE WORLD |
|
PE-35
| Contract No |
126/1/13 |
| Project/Contract Title: |
Wadi Jaleel 110 Kv Power & Pilot Cables Project In Makkah |
| Client Name: |
SCECO-West |
| Location |
Makkah |
| Contract Start Date |
03/4/1997 |
| Completion Date |
02/10/1999 |
| Category: |
Cable, Civil, T&C, SCADA |
| Sector |
Cable, Civil, T&C, SCADA |
| Project Type |
Turnkey |
| Scope of Work: |
The project involves approximately 35km. of 110kV single circuit and 5.5km. of double circuit, including geo-technical investigation, manholes, hand holes, foundations for link boxes and joints, supply of manpower etc.
All circuit s will emanate from Wadi Jaleel Substation.
-138 km. 110kV cable, 1 Core x 630 mm2 Cu / XLPE.
- 192 Nos. Straight through joints.
- 36 Nos. SF6 Termination.
- 40 km. 7/54 Pilot cable.
- 9.50 km. 12F Fibre optic cable.
- Testing and commissioning for the above |
|
PE-36
| Contract No |
98/2/9/1/A |
| Project/Contract Title: |
Hail Network Control Center and Associated Systems. |
| Client Name: |
SEC-CRB |
| Location |
Hail |
| Contract Start Date |
06/6/1998 |
| Completion Date |
08/11/2000 |
| Category: |
SCADA, Automation, Telecom |
| Sector |
SCADA, Automation, Telecom |
| Project Type |
Turnkey |
| Scope of Work: |
- Design, engineering, installation and commissioning of :
Application processors.
Communication processors.
Local Area Network - Fiber Optic FDDI with DAS.
Workstations and replacement of RTU’s (55 Nos.)
- EMS software engineering including database loading, graphic generation, alarm configuration, energy calculations, historical storage, report generation and information storage and retrieval.
- Design, engineering, installation, testing, sagging & commissioning of Optical Ground Wire (OPGW) on 33 & 132kV transmission line of 74km length installed jointing in joint box and splicing.
- Design, engineering, installation of Fiber Optical system of Nokia in Hail area at 8 nos. different substation. |
|
PE-37
| Contract No |
98/2/11/4/ein |
| Project/Contract Title: |
Hail-Qassim Interconnection & Communication System. |
| Client Name: |
SEC-CRB / E.C. |
| Location |
Hail – Qassim |
| Contract Start Date |
15/5/1999 |
| Completion Date |
14/5/2001 |
| Category: |
SCADA, Automation, Telecom |
| Sector |
SCADA, Automation, Telecom |
| Project Type |
Turnkey |
| Scope of Work: |
This was the turnkey project consist of the following :
Design review , supply, installation & commissioning of :
- SCADA, Fibre optic & telecommunication (SDH) from Nokia, System-communicating with two master stations.
- The control system comprises of three nos. dual ported RTU supporting dual communication protocols at three substations.
- Modification of RCC hardware at respective control centres.
- Design, supply & commissioning of two nos., Alcatel 4400 PAX interface with existing network.
- Design, review, supply, installation and replacing of existing mimic board with BARCO type mimic projector and commissioned.
- Supply, design as per requirement of DC system and 50x2A battery charger with 300A battery bank. |
|
PE-38
| Contract No |
94/1/19 |
| Project/Contract Title: |
Construction of Mina-2 110/13.8 kV S/S in Makkah (Lot-2: Civil Works) |
| Client Name: |
SCECO-West |
| Location |
Qurayat |
| Contract Start Date |
1992 |
| Completion Date |
1993 |
| Category: |
Mechanical, Generation, Piping |
| Sector |
Mechanical, Generation, Piping |
| Project Type |
Turnkey |
| Scope of Work:
|
Operation & maintenance staff and engineers to run and maintain the Alfanar installed Power Plant. Mainly responsible for the following :-
- Maintenance of gas turbine 2 x 20MW.
- Maintenance of Diesel Generator 1 x 2.5MW.
-Maintenance of fuel system (unloading, forwarding, fuel treatment plant).
- Fire fighting system.
- Water treatment plant
- Water supply system
- Electrical & central system for the above installation |
|
PE-39
Contract No |
109/1/19 |
Project/Contract Title: |
Construction of Al-Naqa'a 110/13.8 kV S/S in Madinah (Switchgear) |
Client Name: |
SCECO WEST |
Location |
Madinah |
Contract Start Date |
18/08/1999 |
Completion Date |
24/03/2002 |
Category: |
Cable, Civil, T&C, SCADA, E&I |
Sector |
Cable, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey Project |
Scope of Work:
|
Scope of work includes design, supply, installation, testing and commissioning of Al-Naga substation and extension of one bay each at existing Madina South and Al-Bayah substation. Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-40
Contract No |
83207/00 |
Project/Contract Title: |
Reinforcement of Dhahran Central 230/69 kV S/S. |
Client Name: |
SCECO-East |
Location |
Dhahran |
Contract Start Date |
30/11/1999 |
Completion Date |
20/05/2004 |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I |
Sector |
Mechanical, OHTL, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work:
|
This is a turnkey project includes design, supply, installation, testing & commissioning of reinforcement work at 230/69kV Dhahran Central S/S. Reinforcement work provide additional transformation capacity by installation of 230/69kV, 167MVA Power Transformer. Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-41
Contract No |
70/1/19 |
Project/Contract Title: |
Construction of Mushrefa 110/13.8 kV S/S (Lot-1, Switchgear) |
Client Name: |
SCECO-WEST |
Location |
Mushrefa |
Contract Start Date |
27/12/1999 |
Completion Date |
01/06/2002 |
Category: |
Cable, Civil, T&C, SCADA, E&I |
Sector |
Cable, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work:
|
Design, Supply, Installation, Testing & Commissioning of 110 kV GIS S/S consisting 8 bays, 37 bays 13.8 kV Switchgear, complete control & protection system AC/DC system cables. |
|
PE-42
Contract No |
522/19/3 |
Project/Contract Title: |
132/33 kV Transformer Reinforcement |
Client Name: |
SEC-CRB |
Location |
|
Contract Start Date |
18/01/2000 |
Completion Date |
10/04/2002 |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
Design, Manufacture, Supply, Installation, Testing & Commissioning of Power Transformers and its associated equipments at S/S No. 8801, 8076, 8605 complete with GIS, control protection and fire fighting systems.
ELECTRICAL SCOPE OF WORK FOR S/S 8801/8076/8605 :
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-43
Contract No |
7/20/21 |
Project/Contract Title: |
Permanent Power Supply to Sang 115/13.8 kV SS Al Hassa |
Client Name: |
National Guard |
Location |
Al Hassa |
Contract Start Date |
17/9/2000 |
Completion Date |
30/11/2002 |
Category: |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
Design, Manufacture, Supply, Installation, Testing & Commissioning of SANG 115/13.8kV substation including extension of one bay at Mahasen 230kV BSP.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-44
Contract No |
158/1/19 |
Project/Contract Title: |
Upgrade of Overcurrent Relays |
Client Name: |
SEC-WRB |
Location |
|
Contract Start Date |
20/8/2000 |
Completion Date |
08/1/2003 |
Category: |
T&C, E&I |
Sector |
T&C, E&I |
Project Type |
Turnkey |
Scope of Work:
|
Supply, Installation, Testing & Commissioning of -- 426 -- nos. over current relays at 67substations in SEC-WRB. Work includes dismantling of existing over current relays, re-wirings and preparation of as-built drawings.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-45
Contract No |
8.720 |
Project/Contract Title: |
Power Transfromer & Shunt Reactors for KAAU III S/S |
Client Name: |
King Abdu Aziz University |
Location |
|
Contract Start Date |
28/01/2001 |
Completion Date |
28/02/2004 |
Category: |
Civil, T&C, E&I |
Sector |
Civil, T&C, E&I |
Project Type |
Turnkey |
Scope of Work: |
Design, Manufacture, Supply, Installation, Testing & Commissioning of four (4) nos. Power Transformers, 40 MVA, 110/15kV and two (2) nos. shunt reactors, 10-12 MVAR, 13.8 - 15 kV. Civil work include foundations for the power transformers and shunt reactors
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-47
Contract No |
502/22/3 |
Project/Contract Title: |
Reinforcement of 132kV S/S # 8070,8802 & 8803 |
Client Name: |
SEC-CRB |
Location |
|
Contract Start Date |
01/01/2002 |
Completion Date |
01/10/2003 |
Category: |
Mechanical, OHTL, Cable, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, OHTL, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work:
|
Design, Manufacture, Supply, Installation, Testing & Commissioning of Power Transformers and its associated equipments at S/S No. 8070, 8802, 8803 complete with control protection and fire fighting systems.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-48
Contract No |
517/22/3 |
Project/Contract Title: |
Upgrade of Tele-communication & Protection Signal Equipment for the 132 kV Transmission Networks at Al-Qassim. |
Client Name: |
SEC-CRB |
Location |
Al-Qassim |
Contract Start Date |
21/04/2002 |
Completion Date |
23/04/2004 |
Category: |
OHTL, T&C, SCADA, |
Sector |
OHTL, T&C, SCADA, |
Project Type |
Turnkey |
Scope of Work: |
This is a turn-key project and consists the following :-
Design, engineering, installation and commissioning of 350km OPGW (Optical Grounding Wires), NMUGFOC (Non-Metallic Under-Ground Fiber Optic Cable).
Replacement of existing OHGW 132kV Transmission Line with OPGW of 350km approximate length.
Dismantling of existing OHGW 132kV Transmission Line of 350km length.
Design, Engineering, Installation and commissioning of Optical Terminal Equipment and OPGW including SDH, PDH and associated system.
Design, engineering, installation and testing & commissioning of Battery and Battery Charger at different location under this project in Hail & Qassem region.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-49
Contract No |
83544/00 |
Project/Contract Title: |
Permanent Replacement Of Damaged Transformer T603 At Shedgum p/p |
Client Name: |
SEC-ERB |
Location |
Shedgum |
Contract Start Date |
10/4/2002 |
Completion Date |
10/4/2004 |
Category: |
Civil, T&C |
Sector |
Civil, T&C |
Project Type |
Turnkey |
Scope of Work: |
Engineering, Design, Procurement, Installation and Testing & Commissioning of New Power Transformer 13.8\115KV 200\266 MVA And Associated Equipment Including Civil & Structural Works At SHEDGUM P\P.
Installation of new 200\266 MVA 13.8\115 KV Transformer with all accessories supplied by SEC-ERB.
Provide & Install 115kv ,2000A disconnector switch.
Provide & install 6 inch Al.bus along with insulators ,clamps & connectors that may be required for connection to Generator Tr,T603.
Supply & install control & LV power cables.
Grounding system for new equipments.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-50
Contract No |
91/1/22 |
Project/Contract Title: |
Construction of 110/13.8KV S/S at SAFA lot-2,SCADA & Communication System |
Client Name: |
SEC-WRB |
Location |
Safa |
Contract Start Date |
31-07-2002 |
Completion Date |
18-08-2004 |
Category: |
T&C, SCADA |
Sector |
T&C, SCADA |
Project Type |
Turnkey |
Scope of Work:
|
Design ,supply, installation, testing & commissioning of the following equipments:
One RTU at SAFA substation.
Four Tele-protection equipment
48 volt battery & battery charger.
Establishment of remote subscriber and Hot line with LDC Jeddah.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-51
Contract No |
537/22/3 |
Project/Contract Title: |
Construction of 132/13.8kv S/S 8089 in Al-Mugharezat Area, Riyadh |
Client Name: |
SEC-CRB |
Location |
Riyadh |
Contract Start Date |
24-11-2002 |
Completion Date |
23-02-2005 |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of supply ,installation, testing & commissioning of the following: 132 kv GIS & Bus duct (11 bays, 10 CBs)
3 Nos – 132/13.8 kv 60 MVA Transformers.
13.8 kv switchgear.
Control & protection Equipment: ( 132kv Relay Panel,132kv control Panel)
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-52
Contract No |
2/1/2023 |
Project/Contract Title: |
Construction of Jeddah North 380/110/13.8 kV S/S (Switchgear, Power Transformer & Civil Works |
Client Name: |
SEC-WRB |
Location |
Jeddah |
Contract Start Date |
10/5/2003 |
Completion Date |
10/5/2005 |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of design, supply ,installation, testing & commissioning of new 380/110/13.8kV
Substation; main equipment scope is as follows: 380kV GIS – 13 bays
500MVA 380/110kV Power Transformer – 02 Nos.
110kV GIS – 25 bays
40mva 110/13.8kV Power Transformer – 03 Nos.
60MVAR Shunt Reactor – 01 No.
13.8kV Switchgear – 37 bays
380kV Terminal Gantry and Outdoor Equipment like CVT, LT, etc.
Auxiliaries, AC System, DC System, Cabling etc.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-53
Contract No |
72/1/23 |
Project/Contract Title: |
Shifting of S/W Container at Kudai 110 kV S/S and construction of a Retaining wall |
Client Name: |
SEC-WRB |
Location |
Kudai |
Contract Start Date |
4/11/2002 |
Completion Date |
4/5/2003 |
Category: |
Civil, SCADA, E&I |
Sector |
Civil, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of following activities :-
Dismantling all 11kV switchgears, alarm panels, voltage regulation panels, AC/DC panels, control & protection panels, batteries and battery chargers and other equipment inside the 11kV room and put it in a safe location within the substation.
Remove the container and shift it to the store & construct a new concrete room instead of it.
To reinstall all the 11kV switchgear, alarm panels, voltage regulation panel, AC/DC panels, control and protection panels, batteries and battery chargers etc.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-54
Contract No |
46/2002 |
Project/Contract Title: |
Capacity Reinforcement of (7) S/S – Al Baha S/S |
Client Name: |
SEC-SRB |
Location |
Al Baha |
Contract Start Date |
26/4/2003 |
Completion Date |
26/5/2005 |
Category: |
Cable, Civil, T&C, E&I |
Sector |
Cable, Civil, T&C, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
7 nos. 132kV Dead Tank Circuit Breakers
26 sets 132kV Disconnectors
2 nos. 132/13.8kV, 60MVA Power Transformers
12 nos. 132kV Surge Arresters
15 nos. 132kV CVT’s
2 nos. Line Traps
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-55
Contract No |
10331061/00 (534/22/3 |
Project/Contract Title: |
Construction of New 380kV/132kV S/S 9013 |
Client Name: |
SEC-CRB |
Location |
Riyadh |
Contract Start Date |
26/10/2003 |
Completion Date |
26/8/2006 |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Design, supply, erection, testing & commissioning of a new 380/132kv s/s# 9013 in south of Riyadh city twelve (12) bays, 380kv GIS, seventeen (17) bays 132kv GIS, three (3), 380/132/33kv 500mva, power transformers and associated control, protection, relaying metering, auxiliaries, SCADA, telecommunication, fiber optic equipment, (including remote end modification s/s of 380kv & 132kv involved), cables and two double circuits 380kv OHL (approx. 625 meters each) and civil & electromechanical work including 380kv GIS building, 132kv GIS building, 380/132kv transformer rooms and control building etc Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-56
Contract No |
6600008820 - Sub Contractor |
Project/Contract Title: |
Aramco-subcontract-115kV OHL Uthmaniya GOSP 9,11 & 12 control system |
Client Name: |
Al Osais Co Aramco |
Location |
Uthmaniya - |
Contract Start Date |
25/2/2004 |
Completion Date |
26/8/2005 |
Category: |
Cable, OHTL, Civil, T&C, SCADA, |
Sector |
Cable, OHTL, Civil, T&C, SCADA, |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-57
Contract No |
20231001/00 |
Project/Contract Title: |
Replacement of Defective 250MVA Transformer at 380kV KMT S/S |
Client Name: |
SEC-WOA |
Location |
|
Contract Start Date |
15/4/2004 |
Completion Date |
15/3/2005 |
Category: |
Cable, T&C, SCADA, E&I |
Sector |
Cable, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
No. 380/110kV 250MVA Power Transformer
1 Lot 1600mm2 cable and sealing ends
1 Lot MV and LV control and power cables
1 Lot Shifting of damaged transformer, cables and accessories to SEC storage.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-58
Contract No |
01/0286 Sub |
Project/Contract Title: |
115KV Overhead Lines Subcontract at Juaymah Gas Plant (For Aramco) |
Client Name: |
Al Osais Co |
Location |
Juaymah |
Contract Start Date |
APR.2004 |
Completion Date |
DEC. 2004 |
Category: |
Civil, T&C, SCADA, E&I |
Sector |
Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
Provision of professional working group to provide the following services for the:
69/13.8kV Power Transformer 30/40MVA
Disconnectors Alignment., Termination of high voltage conductor to various equipment, Supervision of installation for the following equipment:
230kV SF6 GCB 11 Nos.
230kV Motorised Disconnect Switch 13 Nos
230kV CCVT 6 Nos.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-58
Contract No |
01/0286 Sub |
Project/Contract Title: |
115kV Overhead Lines Subcontract At Abu Ali Plant |
Client Name: |
Al Osais Co Aramco |
Location |
|
Contract Start Date |
APR.2004 |
Completion Date |
DEC. 2004 |
Category: |
OHTL |
Sector |
OHTL |
Project Type |
Turnkey |
Scope of Work: |
Supply & installation of clamps (18 Nos.) required for dropping of conductor to the following equipment (CT / Transformer / Surge Arrester).
New Overhead string bus cable from existing SF6 Circuit Breakers to new 115/13.8kV Transformers including termination, OHL materials, supports and miscellaneous.
New Overhead shield wire from existing wooden poles to relocated steel gantries including termination, OHL materials, supports and miscellaneous.
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-59
Contract No |
20431067/00 |
Project/Contract Title: |
Extension of Jeddah North Substation |
Client Name: |
SEC-WRB |
Location |
Jeddah |
Contract Start Date |
28/2/2005 |
Completion Date |
28/12/2006 |
Category: |
Mechanical, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following
500MVA Power Transformer
380kV & 110kV Bus Duct
6 nos 110kV GIS Bays
Transformer foundation, bus duct support foundation
Transformer fire fighting , water spray system extension
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-60
Contract No |
10331151/00 |
Project/Contract Title: |
Protection Modification of 380/132 kV System at Hail Area |
Client Name: |
SEC-COA |
Location |
Hail |
Contract Start Date |
28/02/05 |
Completion Date |
….. |
Category: |
Electrical & Instrumentation |
Sector |
Electrical & Instrumentation |
Project Type |
Turnkey Project |
Scope of Work:
|
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
Batteries and Battery Chargers for 380 & 132 kV systems
New DC Distribution Board for 132kV System
Modification of DCDB for new requirement of Protection segregation
Fault Recorders at S/S# 9030, 8902, 8912, 8914, 8916, 8917, 8918,
8920 & 8921
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-61
Contract No |
10231010/00 |
Project/Contract Title: |
Construction of 132kV Cable Circuit 8060/9019, 8058/8006 To Connect # 9013 To The Network |
Client Name: |
SEC-COA |
Location |
|
Contract Start Date |
14/3/2005 |
Completion Date |
15/5/2007 |
Category: |
Cable, Civil, T&C, SCADA, E&I |
Sector |
Cable, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
132kv Cable Circuit (8019-8060). Length of S/C is 6 km.
Existing 132kv Cable Circuit 8058/8019 and 8006/8019 will be disconnected from 8019 S/S and connected outside the S/S to form a Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-62
Contract No |
30441079/00 |
Project/Contract Title: |
Construction Of New Skaka Industrial 33/13.8KV ss |
Client Name: |
SEC-EOA |
Location |
Skaka |
Contract Start Date |
1/10/05 |
Completion Date |
07/03/08 |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I |
Sector |
Mechanical, Cable, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is turnkey project and consist of engineering & design, supply, installation, testing & commissioning ofthe following :-
5bays 33kV Switchgear, 1250A
2 Nos 20/25MVA, 33/13.8kV Power Transformer
13bay 13.8kV Switchgear, 2000A
1 Lot 33/13.8kV Cables & terminations
2 bays Extension of 33kV Switchgear at Al Jouf source S/S
1 Lot SCADA & Telecom, SOE, Annunciators, 33 control panels, relay panels
1 Lot 380V AC distribution board, batteries, DC distribution boards,
1 Lot Ring Main Unit
Request for complete details pertaining to this project – psmd@alfanar.com |
|
PE-64
Contract No |
10431153/00 |
Project/Contract Title: |
Transformer Reinforcement At 132/33 Kv Ss # 8812 in Al-Zulfi At Al-Qassim Area |
Client Name: |
SEC-COA |
Location |
Al Qassim |
Contract Start Date |
04/6/2005 |
Completion Date |
8/1/2007 |
Category: |
Mechani | | | |