PE-72
Contract No |
10531109/00 |
Project/Contract Title: |
Enhancement work for Telecommunication Systems Supporting Energy Transmission Network in sec-coa |
Client Name: |
SEC-COA |
Location |
…… |
Contract Start Date |
29-Mar-06 |
Completion Date |
26-Sep-08 |
Progress % |
83.32% |
Category: |
OHTL, Civil, T&C, SCADA, |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
280 KM OPGW Cables (24 fibres equivalent to 14.33mm GW)
101 KM OPGW Cables (24 fibres equivalent to 7.91mm GW)
49 KM OPGW Cables (36 fibres equivalent to 18.1mm GW)
11 KM U/G NFOC Cables (36 fibres)
2.6 KM U/G NFOC Cables (24 fibres)
1 Lot Joint boxes and splitter boxes
1 Lot Civil works
1 Lot Spare parts and training at site
Request for more details pertaining to this project – psmd@alfanar.com |
PE-79
Contract No |
10631061/00 |
Project/Contract Title: |
Construction of 132/13.8 kV SS. No. 8139 At King Abdullah Area in Riyadh City |
Client Name: |
SEC-COA |
Location |
Riyadh |
Contract Start Date |
22-Nov-06 |
Completion Date |
25-Jul-09 |
Progress % |
48.47% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
This is a turn key project and consists of supply installation, testing & commissioning
Request for more details pertaining to this project – psmd@alfanar.com |
PE-80
Contract No |
10631060/00 |
Project/Contract Title: |
Reinforcement Of 132/33 Kv Ss No. 8705 At Al Kharj Area |
Client Name: |
SEC-COA |
Location |
Al Kharj |
Contract Start Date |
22-Dec-06 |
Completion Date |
25-Sep-09 |
Progress % |
74.74% |
Category: |
Mechanical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
This is a turn key project and consists of supply ,installation, testing & commissioning of the following:
Request for more details pertaining to this project – psmd@alfanar.com |
PE-80
Contract No |
10631059/00 |
Project/Contract Title: |
Construction of 132/33kV SS. No. 8065
At. Al Thumamah Area in Riyadh City |
Client Name: |
SEC-COA |
Location |
Al Thumamah - Riyadh |
Contract Start Date |
22-Nov-06 |
Completion Date |
25-Sep-09 |
Progress % |
79.79% |
Category: |
Mechnical, Cable, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
This is a turn key project and consists of supply ,installation, testing & commissioning of the following:
2 Nos – 132/33 kV 100 MVA Transformers.
Control & protection Equipment: ( 132kv Relay Panel,132kv control Panel)
Civil & mechanical works (Transformer Building)
1 sets 125 Battery & battery Charger .
300kv,33/0.22 kV auxiliary Transformers.
XLPE /CU/ 132 & 13.8kv Cables.
New SCADA System.
Request for more details pertaining to this project – psmd@alfanar.com |
PE-82
Contract No |
30631089/00 |
Project/Contract Title: |
380 kV Substation Works Associated with Generation Expansion Project of PP-8 in Riyadh City (S/S 9021) |
Client Name: |
SEC-EOA |
Location |
Riyadh |
Contract Start Date |
25-Dec-06 |
Completion Date |
15-Dec-08 |
Progress % |
88.28% |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
380KV Gas Insulated Switchgear consisting of 14 Bays
Two Nos. 1500KVA, 4.16/ 0.220KV station service transformer
Two nos. 4.16/ 0.220KV Switchgear with Vacuum Circuit Breaker
220/127V AC auxiliary power system
DC auxiliary power system
Lighting and small power system as well as grounding and shielding systems
380KV metal oxide surge arrestors
380KV Coupling capacitive voltage transformer
380KV post insulators
380KV and Control buildings
Control and Relay Equipments
PLC/ SCADA and Teleprotection Signaling Equipments
Fire Detection and Fire alarm System
Request for more details pertaining to this project – psmd@alfanar.com |
PE-85
Contract No |
10731045/00 |
Project/Contract Title: |
Construction of New 132/13.8KV S/Stn No. 8905 at Al Maseef Area, Hail City |
Client Name: |
SEC-COA |
Location |
Al Maseef Area, Hail City |
Contract Start Date |
17-Feb-08 |
Completion Date |
16- Mar-10 |
Progress % |
5% |
Category: |
|
Project Type |
Turnkey |
Request for more details pertaining to this project – psmd@alfanar.com |
PE-86
Contract No |
20733005/00 |
Project/Contract Title: |
Construction of new 380KV S/S and works Associated with Integration Phase-1 of Rabigh (2) Power Plant (Stage 1) |
Client Name: |
SEC-WOA |
Location |
Rabigh |
Contract Start Date |
12-Nov-07 |
Completion Date |
12-Oct-09 |
Progress % |
17.17% |
Category: |
|
Project Type |
Turnkey |
Request for more details pertaining to this project – psmd@alfanar.com |
PE-87
Contract No |
TS-1182 |
Project/Contract Title: |
Construction of 132/13.8kV Substation No. 8133 , alfanar Industrial Area |
Client Name: |
SEC-COA |
Location |
|
Contract Start Date |
1-Jan-08 |
Completion Date |
12-Mar-10 |
Progress % |
9% |
Category: |
|
Project Type |
|
| Request for more details pertaining to this project – psmd@alfanar.com
|
Completed Projects:
PE-55
Contract No |
10331061/00 (534/22/3 |
Project/Contract Title: |
Construction of New 380kV/132kV S/S 9013 |
Client Name: |
SEC-CRB |
Location |
Riyadh |
Contract Start Date |
26/10/2003 |
Completion Date |
26/8/2006 |
Category: |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Cable, OHTL, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
| Scope of Work: |
Design, supply, erection, testing & commissioning of a new 380/132kv s/s# 9013 in south of Riyadh city twelve (12) bays, 380kv GIS, seventeen (17) bays 132kv GIS, three (3), 380/132/33kv 500mva, power transformers and associated control, protection, relaying metering, auxiliaries, SCADA, telecommunication, fiber optic equipment, (including remote end modification s/s of 380kv & 132kv involved), cables and two double circuits 380kv OHL (approx. 625 meters each) and civil & electromechanical work including 380kv GIS building, 132kv GIS building, 380/132kv transformer rooms and control building etc
Request for complete details pertaining to this project – psmd@alfanar.com |
PE-61
Contract No |
10231010/00 |
Project/Contract Title: |
Construction of 132kV Cable Circuit 8060/9019, 8058/8006 To Connect # 9013 To The Network |
Client Name: |
SEC-COA |
Location |
|
Contract Start Date |
14/3/2005 |
Completion Date |
15/5/2007 |
Category: |
Cable, Civil, T&C, SCADA, E&I |
Sector |
Cable, Civil, T&C, SCADA, E&I |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
132kv Cable Circuit (8019-8060). Length of S/C is 6 km.
Existing 132kv Cable Circuit 8058/8019 and 8006/8019 will be disconnected from 8019 S/S and connected outside the S/S to form a Request for complete details pertaining to this project – psmd@alfanar.com |
PE-64
Contract No |
10431153/00 |
Project/Contract Title: |
Transformer Reinforcement At 132/33 Kv Ss # 8812 in Al-Zulfi At Al-Qassim Area |
Client Name: |
SEC-COA |
Location |
Al Qassim |
Contract Start Date |
04/6/2005 |
Completion Date |
8/1/2007 |
Category: |
Mechanical, Civil, T&C, SCADA, E&I, Piping |
Sector |
Mechanical, Civil, T&C, SCADA, E&I, Piping |
Project Type |
Turnkey |
Scope of Work: |
This is a turn key project and consists of Engineering & Design, Supply, installation, testing and commissioning of the following :-
1 nos. 100MVA, 132/33KV, Power Transformer
3 nos. 300KVA, 33/0.231kV Auxiliary / Grounding Transformer
8 nos 33kV Switchgear panels
2 nos. Battery & Charger
1 Lot Civil works
1 Lot 132kV XLPE cable and accessories.
1 Lot 33kV XLPE cable and accessories
1 Lot Fire Fighting Systems
1 Nos. AC Distribution Board.
1 Lot Power Transformer and auxiliary transformers foundations, oil separation pit, transformer room modification in ventilation system for transformers.
1 Lot Latest version of Sergi system for fire fighting of the new transformer along with nitrogen and control panels
Request for complete details pertaining to this project – psmd@alfanar.com |
| | |